Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,136
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1116 # 04 Y:2025 | 04 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,842 | $908 | n/a |
UD1116 # 02 Y:2025 | 02 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,462 | $15,035 | n/a |
UD1116 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,791 | $0 | n/a |
UD1119 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,511 | $40,000 | n/a |
UD1119 # 06 Y:2025 | 06 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $24,495 | $100,000 | n/a |
UD1119 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $649 | $6,400 | n/a |
UD1119 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $855 | $550 | n/a |
UD1119 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,022 | $100,000 | n/a |
UD1119 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,147 | $16,000 | n/a |
UD1115 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,515 | $7,035 | n/a |
UD1115 # 06 Y:2025 | 06 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,479 | $1,015 | n/a |
UD1115 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,587 | $5,423 | n/a |
UD1115 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $892 | $1,267 | n/a |
UD1115 # 03 Y:2025 | 03 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,016 | $760 | n/a |
UD1115 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,927 | $3,700 | n/a |
UD1114 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $7,290 | $15,550 | n/a |
UD1114 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,835 | $7,124 | n/a |
UD1114 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,731 | $0 | n/a |
UD1114 # 04 Y:2025 | 04 | 2025 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,367 | $0 | n/a |
UD1114 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,102 | $4,200 | n/a |
UD1114 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $157 | $0 | n/a |
UD1114 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,157 | $9,554 | n/a |
UD1113 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,836 | $1,000 | n/a |
UD1113 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,832 | $4,200 | n/a |
UD1113 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,857 | $1,312 | n/a |