Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0245 # 10 Y:2017 | 10 | 2017 | USE PHOTOCELL CONTROLS | $1,335 | $906 | Not Implemented |
MZ0245 # 09 Y:2017 | 09 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,202 | $500 | Implemented |
MZ0245 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $3,089 | $2,730 | Implemented |
MZ0245 # 07 Y:2017 | 07 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,321 | $1,300 | Implemented |
MZ0245 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,755 | $150 | Implemented |
MZ0245 # 05 Y:2017 | 05 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,041 | $3,300 | Not Implemented |
MZ0245 # 04 Y:2017 | 04 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,371 | $0 | Not Implemented |
MZ0245 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $13,572 | $12,250 | Not Implemented |
MZ0245 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,450 | $2,183 | Implemented |
MZ0245 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,959 | $47,658 | Implemented |
UU0125 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $4,418 | $7,220 | Implemented |
UU0125 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,417 | $39,198 | Not Implemented |
UU0125 # 04 Y:2017 | 04 | 2017 | RECOVER AND REUSE WASTE MATERIAL | $6,187 | $3,150 | Implemented |
UU0125 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,110 | $20 | Not Implemented |
UU0125 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,851 | $18,588 | Implemented |
UU0125 # 01 Y:2017 | 01 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,802 | $0 | Not Implemented |
UU0125 # 07 Y:2017 | 07 | 2017 | MINIMIZE WATER USAGE | $3,700 | $200 | Implemented |
UU0125 # 08 Y:2017 | 08 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,690 | $0 | Not Implemented |
OR0696 # 01 Y:2017 | 01 | 2017 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $179,573 | $3,044 | Not Implemented |
OR0696 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,265 | $37,275 | Not Implemented |
OR0696 # 03 Y:2017 | 03 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,365 | $5,880 | Not Implemented |
OR0696 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,910 | $10,116 | Not Implemented |
MZ0241 # 01 Y:2017 | 01 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $326 | $0 | Implemented |
MZ0241 # 02 Y:2017 | 02 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,238 | $3,570 | Implemented |
MZ0241 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,547 | $4,050 | Implemented |