IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0613 # 01 Y:2008 01 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $27,040 $12,030 Not Implemented
CO0613 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $9,230 $3,000 Not Implemented
CO0613 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,500 $3,000 Implemented
CO0613 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,060 $120 Not Implemented
CO0613 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,330 $9,130 Implemented
CO0613 # 06 Y:2008 06 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,300 $39,600 Not Implemented
CO0613 # 07 Y:2008 07 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,390 $1,000 Implemented
CO0612 # 01 Y:2008 01 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,590 $59,400 Not Implemented
CO0612 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,920 $300 Implemented
CO0612 # 03 Y:2008 03 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $160 $450 Implemented
CO0612 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,400 $25,650 Not Implemented
CO0612 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $5,270 $10,430 Not Implemented
CO0612 # 06 Y:2008 06 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,930 $15,400 Not Implemented
CO0612 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,430 $960 Not Implemented
CO0611 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,560 $23,950 Not Implemented
CO0611 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $200 Implemented
CO0611 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $500 $1,755 Implemented
CO0611 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $20,810 $33,480 Not Implemented
CO0611 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,360 $20,290 Implemented
CO0611 # 06 Y:2008 06 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $1,770 $11,000 Not Implemented
CO0610 # 01 Y:2008 01 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,340 $13,163 Implemented
CO0610 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,470 $1,400 Implemented
CO0610 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $880 $500 Implemented
CO0610 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,690 $15,668 Implemented
CO0610 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,680 $3,991 Implemented