IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,707

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0166 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $970 $648 Not Implemented
DS0166 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,134 $1,750 Not Implemented
DS0166 # 06 Y:2000 06 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $688 $0 Not Implemented
DS0166 # 07 Y:2000 07 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,174 $4,000 Not Implemented
DS0166 # 08 Y:2000 08 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,210 $80,000 Implemented
DS0166 # 09 Y:2000 09 2000 RECOVER AND REUSE WASTE MATERIAL $1,440 $1,175 Not Implemented
DS0166 # 10 Y:2000 10 2000 $16,522 $4,316 Not Implemented
DS0165 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,045 $12,005 Implemented
DS0165 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $535 $432 Not Implemented
DS0165 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $494 $275 Not Implemented
DS0165 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,267 $42,720 Not Implemented
DS0165 # 05 Y:2000 05 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $19,293 $4,085 Not Implemented
DS0165 # 06 Y:2000 06 2000 BURN WASTE OIL FOR HEAT $4,893 $3,695 Not Implemented
DS0165 # 07 Y:2000 07 2000 SELL COMBUSTIBLE WASTE $22,432 $900 Not Implemented
DS0165 # 08 Y:2000 08 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $51,099 $94,300 Not Implemented
DS0165 # 09 Y:2000 09 2000 INSTALL SYSTEM TO COLLECT SCRAP $6,793 $1,634 Not Implemented
DS0163 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $447 $44 Not Implemented
DS0163 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $301 $560 Not Implemented
DS0163 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,046 $8,012 Not Implemented
DS0163 # 04 Y:2000 04 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,481 $5,600 Not Implemented
DS0163 # 05 Y:2000 05 2000 SELL OIL TO RECYCLER $412 $320 Not Implemented
DS0163 # 06 Y:2000 06 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $1,033 $4,000 Not Implemented
DS0163 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $640 $-1,560 Implemented
DS0161 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,330 $7,355 Implemented
DS0161 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $1,323 $1,050 Implemented