IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0045 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $160 Implemented
OR0251 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $69,966 $115,000 Implemented
OR0251 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,007 $9,588 Implemented
OR0251 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,652 $17,025 Not Implemented
OR0251 # 04 Y:1995 04 1995 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $145,120 $1,495,000 Not Implemented
UM0044 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,181 $1,433 Implemented
UM0044 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,738 $25,330 Implemented
UM0044 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $139 $350 Implemented
UM0044 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,745 $4,000 Implemented
UD0474 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $17,216 $20,000 Implemented
UD0474 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,332 $14,000 Not Implemented
UD0474 # 03 Y:1995 03 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,945 $0 Not Implemented
UD0474 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,696 $2,857 Not Implemented
UD0474 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $4,012 $300 Implemented
UD0474 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,825 $2,000 Not Implemented
IA0132 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,991 $245 Implemented
IA0132 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,009 $50 Implemented
IA0132 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,448 $93 Not Implemented
IA0132 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,481 $4,837 Not Implemented
IA0132 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $136 Not Implemented
IA0132 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $124 $231 Not Implemented
IA0132 # 07 Y:1995 07 1995 PAY UTILITY BILLS ON TIME $936 $0 Implemented
IA0132 # 08 Y:1995 08 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,841 $12,000 Implemented
IA0132 # 09 Y:1995 09 1995 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $35,460 $500 Not Implemented
IA0132 # 10 Y:1995 10 1995 USE PLASTIC PALLETS INSTEAD OF WOOD $5,805 $16,900 Not Implemented