Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0301 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,961 | $3,154 | Not Implemented |
NC0301 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $812 | $100 | Not Implemented |
MI0070 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,868 | $2,300 | Implemented |
MI0070 # 02 Y:2004 | 02 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $197,433 | $74,805 | Implemented |
MI0070 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $175 | $0 | Not Implemented |
MI0070 # 04 Y:2004 | 04 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,397 | $5,248 | Implemented |
MI0070 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,027 | $0 | Not Implemented |
IA0352 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,699 | $3,750 | Implemented |
IA0352 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,216 | $416 | Implemented |
IA0352 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,245 | $6 | Implemented |
IA0352 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,182 | $1 | Not Implemented |
IA0352 # 05 Y:2004 | 05 | 2004 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $12,016 | $2 | Implemented |
IA0352 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $528 | $136 | Implemented |
IA0352 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,595 | $6,618 | Implemented |
IA0352 # 08 Y:2004 | 08 | 2004 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $4,044 | $440 | Not Implemented |
IA0352 # 09 Y:2004 | 09 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $867,815 | $171 | Implemented |
BD0273 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,813 | $3,470 | Implemented |
BD0273 # 02 Y:2004 | 02 | 2004 | INSTALL WIND POWERED ELECTRIC GENERATOR | $10,682 | $50,000 | Implemented |
BD0273 # 03 Y:2004 | 03 | 2004 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $6,786 | $3,000 | Implemented |
BD0273 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,606 | $4,270 | Implemented |
BD0273 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,942 | $255 | Implemented |
BD0273 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $2,608 | $1,725 | Implemented |
BD0273 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,185 | $2,900 | Implemented |
BD0273 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,098 | $0 | Implemented |
BD0273 # 09 Y:2004 | 09 | 2004 | USE PLASTIC PALLETS INSTEAD OF WOOD | $22,476 | $27,625 | Implemented |