IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0301 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,961 $3,154 Not Implemented
NC0301 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $812 $100 Not Implemented
MI0070 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $21,868 $2,300 Implemented
MI0070 # 02 Y:2004 02 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $197,433 $74,805 Implemented
MI0070 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $175 $0 Not Implemented
MI0070 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,397 $5,248 Implemented
MI0070 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,027 $0 Not Implemented
IA0352 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $3,699 $3,750 Implemented
IA0352 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,216 $416 Implemented
IA0352 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,245 $6 Implemented
IA0352 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,182 $1 Not Implemented
IA0352 # 05 Y:2004 05 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $12,016 $2 Implemented
IA0352 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $528 $136 Implemented
IA0352 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $6,618 Implemented
IA0352 # 08 Y:2004 08 2004 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $4,044 $440 Not Implemented
IA0352 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $867,815 $171 Implemented
BD0273 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,813 $3,470 Implemented
BD0273 # 02 Y:2004 02 2004 INSTALL WIND POWERED ELECTRIC GENERATOR $10,682 $50,000 Implemented
BD0273 # 03 Y:2004 03 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,786 $3,000 Implemented
BD0273 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,606 $4,270 Implemented
BD0273 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,942 $255 Implemented
BD0273 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $2,608 $1,725 Implemented
BD0273 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,185 $2,900 Implemented
BD0273 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,098 $0 Implemented
BD0273 # 09 Y:2004 09 2004 USE PLASTIC PALLETS INSTEAD OF WOOD $22,476 $27,625 Implemented