Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0390 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,273 | $1,040 | Implemented |
MI0390 # 02 Y:2021 | 02 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,349 | $7,564 | Not Implemented |
MI0390 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $3,477 | Implemented |
MI0390 # 04 Y:2021 | 04 | 2021 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,586 | $1,120 | Not Implemented |
NC0669 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,041 | $11,374 | n/a |
NC0669 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,266 | $40,000 | n/a |
NC0669 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $854 | $300 | n/a |
NC0669 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,310 | $30,000 | n/a |
NC0668 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $5,587 | n/a |
NC0668 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $69 | $280 | n/a |
NC0668 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,314 | $8,000 | n/a |
NC0668 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,843 | $6,325 | n/a |
NC0668 # 05 Y:2021 | 05 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,271 | $22,000 | n/a |
BS0153 # 01 Y:2021 | 01 | 2021 | INSTALL OCCUPANCY SENSORS | $30,759 | $3,726 | Not Implemented |
BS0153 # 02 Y:2021 | 02 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $36,134 | $5,961 | Not Implemented |
BS0153 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $733 | $490 | Not Implemented |
BS0153 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $98,310 | $307,800 | Not Implemented |
UF0568 # 01 Y:2021 | 01 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $52,474 | $147,852 | Not Implemented |
UF0568 # 02 Y:2021 | 02 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $20,147 | $49,165 | Implemented |
UF0568 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,182 | $12,247 | Implemented |
UF0568 # 04 Y:2021 | 04 | 2021 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $8,146 | $700 | Not Implemented |
UF0568 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $3,117 | $9,240 | Implemented |
UF0568 # 06 Y:2021 | 06 | 2021 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $1,828 | $0 | Not Implemented |
UF0568 # 07 Y:2021 | 07 | 2021 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,670,260 | $53,000 | Not Implemented |
UF0568 # 08 Y:2021 | 08 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $8,760 | $8,000 | Not Implemented |