Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0094 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,500 | $2,500 | Not Implemented |
UD0525 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,300 | $40 | n/a |
UD0525 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,791 | $1,000 | n/a |
UD0525 # 03 Y:1997 | 03 | 1997 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $6,041 | $0 | n/a |
UD0525 # 04 Y:1997 | 04 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $7,992 | $6,000 | n/a |
UD0525 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,954 | $5,047 | n/a |
UD0525 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,450 | $9,153 | n/a |
UD0525 # 07 Y:1997 | 07 | 1997 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $3,203 | $1,000 | n/a |
UD0525 # 08 Y:1997 | 08 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,420 | $3,456 | n/a |
UD0525 # 09 Y:1997 | 09 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,680 | $4,000 | n/a |
UD0525 # 10 Y:1997 | 10 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,482 | $0 | n/a |
UD0524 # 01 Y:1997 | 01 | 1997 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,145 | $0 | Implemented |
UD0524 # 02 Y:1997 | 02 | 1997 | USE OPTIMUM THICKNESS INSULATION | $1,914 | $9,400 | Implemented |
UD0524 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,568 | $0 | Not Implemented |
UD0524 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,898 | $16,158 | Implemented |
UD0524 # 05 Y:1997 | 05 | 1997 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $5,400 | $22,500 | Implemented |
UD0522 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,126 | $6,975 | Implemented |
UD0522 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $647 | $2,000 | Implemented |
UD0522 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,104 | $16,862 | Implemented |
UD0522 # 04 Y:1997 | 04 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $33,190 | $7,500 | Not Implemented |
UD0522 # 05 Y:1997 | 05 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $22,129 | $4,000 | Implemented |
UD0522 # 06 Y:1997 | 06 | 1997 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $18,194 | $10,000 | Not Implemented |
UD0522 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $3,644 | $3,500 | Not Implemented |
UD0522 # 08 Y:1997 | 08 | 1997 | BURN A LESS EXPENSIVE GRADE OF FUEL | $11,573 | $5,000 | Not Implemented |
UD0523 # 01 Y:1997 | 01 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $34,683 | $0 | Implemented |