Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0513 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $195,658 | $50,000 | Not Implemented |
UD0513 # 04 Y:1997 | 04 | 1997 | OPTIMIZE PLANT POWER FACTOR | $21,006 | $25,000 | Implemented |
UD0513 # 05 Y:1997 | 05 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,283 | $6,465 | Implemented |
UD0513 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,603 | $19,910 | Implemented |
UD0513 # 07 Y:1997 | 07 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,228 | $16,000 | Implemented |
UD0513 # 08 Y:1997 | 08 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $110,288 | $500 | Not Implemented |
UD0512 # 01 Y:1997 | 01 | 1997 | CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE | $123,592 | $180,000 | Not Implemented |
UD0512 # 02 Y:1997 | 02 | 1997 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $30,443 | $20,000 | Not Implemented |
UD0512 # 03 Y:1997 | 03 | 1997 | USE POWER DURING OFF-PEAK PERIODS | $24,132 | $0 | Not Implemented |
UD0512 # 04 Y:1997 | 04 | 1997 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,710 | $5,000 | Not Implemented |
UD0512 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,882 | $12,861 | Not Implemented |
UD0512 # 06 Y:1997 | 06 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,085 | $2,465 | Not Implemented |
WV0109 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,527 | $5,295 | Implemented |
WV0109 # 02 Y:1997 | 02 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,337 | $384 | Implemented |
WV0109 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $616 | $478 | Not Implemented |
WV0109 # 04 Y:1997 | 04 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $962 | $15 | Not Implemented |
WV0109 # 05 Y:1997 | 05 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,265 | $3,000 | Implemented |
WV0109 # 06 Y:1997 | 06 | 1997 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $7,904 | $6,300 | Implemented |
WV0109 # 07 Y:1997 | 07 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,550 | $441 | Implemented |
WV0109 # 08 Y:1997 | 08 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $35,000 | $5,000 | Not Implemented |
WV0109 # 09 Y:1997 | 09 | 1997 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $5,200 | $200 | Not Implemented |
WV0109 # 10 Y:1997 | 10 | 1997 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $46,800 | $0 | Not Implemented |
UD0511 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,757 | $21,000 | Implemented |
UD0511 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $885 | $4,700 | Implemented |
UD0511 # 03 Y:1997 | 03 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $28,000 | $12,000 | Implemented |