IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,853

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0159 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,038 $120 n/a
NV0159 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,714 $2,756 n/a
NV0159 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $4,203 $688 n/a
NV0159 # 04 Y:2000 04 2000 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $3,014 $9,025 n/a
SF0198 # 01 Y:2000 01 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,396 $4,740 Implemented
SF0198 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $307 $600 Implemented
SF0198 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $215 $0 Implemented
SF0198 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $412 $1,992 Implemented
SF0198 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,299 $4,199 Implemented
SF0198 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,800 $80 Implemented
SF0198 # 07 Y:2000 07 2000 $24,608 $3,400 Implemented
SF0198 # 08 Y:2000 08 2000 $773 $0 Implemented
SD0256 # 01 Y:2000 01 2000 INSTALL SKYLIGHTS $18,038 $27,000 Implemented
SD0256 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,703 $7,230 Implemented
SD0256 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $205,696 $64,500 Not Implemented
SD0256 # 04 Y:2000 04 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,732 $5,400 Not Implemented
SD0256 # 05 Y:2000 05 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $290,738 $0 Implemented
SD0253 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $108,760 $68,000 Not Implemented
SD0253 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,706 $15,000 Not Implemented
SD0253 # 03 Y:2000 03 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,080 $25,000 Not Implemented
SD0253 # 04 Y:2000 04 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,561 $12,000 Not Implemented
SD0253 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,622 $7,000 Not Implemented
SD0253 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,732 $5,400 Not Implemented
SD0253 # 07 Y:2000 07 2000 $22,500 $15,000 Not Implemented
SD0258 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $139,359 $30,480 Implemented