IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0511 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,452 $20,000 Implemented
UD0511 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $52,379 $35,000 Implemented
UD0511 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $56,779 $70,000 Implemented
UD0511 # 07 Y:1997 07 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $23,300 $0 Not Implemented
UD0511 # 08 Y:1997 08 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,802 $0 Implemented
UD0511 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $6,180 $5,000 Not Implemented
UD0511 # 10 Y:1997 10 1997 RECYCLE CASTING SAND $488,953 $900,000 Not Implemented
UD0510 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $2,926 $5,000 Not Implemented
UD0510 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,651 $500 Implemented
UD0510 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,314 $1,000 Implemented
UD0510 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,641 $0 Not Implemented
UD0510 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,774 $33,595 Not Implemented
UD0510 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $356 $910 Not Implemented
UD0509 # 01 Y:1996 01 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $71,145 $170,000 Not Implemented
UD0509 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,840 $0 Implemented
UD0509 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,600 $5,000 Implemented
UD0509 # 04 Y:1996 04 1996 TREAT AND REUSE RINSE WATERS $160,244 $100,000 Not Implemented
UD0509 # 05 Y:1996 05 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,320 $0 Not Implemented
UD0509 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,442 $0 Not Implemented
UD0509 # 07 Y:1996 07 1996 USE PHOTOCELL CONTROLS $1,279 $621 Implemented
UD0509 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,559 $3,600 Not Implemented
UD0509 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $512 $1,600 Implemented
UD0509 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,492 $3,080 Implemented
UD0507 # 01 Y:1996 01 1996 BURN A LESS EXPENSIVE GRADE OF FUEL $5,738 $7,500 Not Implemented
UD0507 # 02 Y:1996 02 1996 USE POWER DURING OFF-PEAK PERIODS $9,357 $0 Not Implemented