IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0458 # 04 Y:2018 04 2018 USE SOLAR HEAT FOR HEAT $15,016 $6,034 Not Implemented
AS0458 # 05 Y:2018 05 2018 INSTALL SKYLIGHTS $14,020 $33,868 Not Implemented
AS0458 # 06 Y:2018 06 2018 RECOVER AND REUSE COOLING WATER $3,500 $2,576 Not Implemented
AS0458 # 07 Y:2018 07 2018 COVER OPEN TANKS $1,285 $0 Not Implemented
AS0458 # 08 Y:2018 08 2018 AIR CONDITION ONLY SPACE NECESSARY $713 $312 Not Implemented
AS0457 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,174 $0 Implemented
AS0457 # 02 Y:2018 02 2018 USE SOLAR HEAT FOR HEAT $7,441 $1,961 Not Implemented
AS0457 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,791 $19,647 Not Implemented
AS0457 # 04 Y:2018 04 2018 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $4,539 $2,530 Not Implemented
AS0457 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,412 $2,750 Not Implemented
AS0457 # 06 Y:2018 06 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,736 $7,600 Not Implemented
AS0457 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $676 Implemented
AS0456 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,722 $320 Implemented
AS0456 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,727 $13,500 Not Implemented
AS0456 # 03 Y:2018 03 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $46,649 $220,160 Not Implemented
AS0456 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $30,900 $16,614 Not Implemented
AS0456 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,670 $51,257 Not Implemented
AS0456 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82,206 $176,400 Implemented
AS0456 # 07 Y:2018 07 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,546 $0 Not Implemented
AS0455 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,307 $180 Implemented
AS0455 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,768 $800 Not Implemented
AS0455 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,097 $36,012 Implemented
AS0455 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,551 $12,598 Implemented
AS0455 # 05 Y:2018 05 2018 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $114,480 $30,000 Implemented
AS0455 # 06 Y:2018 06 2018 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,556 $0 Not Implemented