IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,589

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0519 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,344 $450 Implemented
MA0519 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,240 $500 Implemented
MA0515 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,976 $0 Implemented
MA0515 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,745 $4,805 Implemented
MA0515 # 03 Y:2002 03 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,060 $0 Not Implemented
MA0515 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $717 $0 Implemented
MA0509 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $21,321 $60,800 Not Implemented
MA0509 # 02 Y:2002 02 2002 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $18,790 $45,905 Implemented
MA0509 # 03 Y:2002 03 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,396 $0 Implemented
MA0509 # 04 Y:2002 04 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,396 $4,200 Implemented
MA0509 # 05 Y:2002 05 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,790 $1,200 Implemented
MA0509 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $439 $1,600 Implemented
MA0509 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $230 $608 Not Implemented
MA0509 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $161 $4,560 Not Implemented
MA0487 # 01 Y:2001 01 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $496,200 $950,000 Not Implemented
MA0487 # 02 Y:2001 02 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $432,600 $425,000 Not Implemented
MA0487 # 03 Y:2001 03 2001 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $122,200 $165,000 Not Implemented
MA0487 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $155,300 $44,000 Not Implemented
MA0487 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $112,000 $135,000 Not Implemented
MA0487 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,000 $100,000 Not Implemented
MA0487 # 07 Y:2001 07 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $61,000 $23,000 Not Implemented
MA0487 # 08 Y:2001 08 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $50,300 $13,000 Not Implemented
MA0487 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $850 Not Implemented
MA0480 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,120 $282,000 Not Implemented
MA0480 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,190 $10,000 Not Implemented