Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,011
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0153 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $19,979 | $7,500 | Not Implemented |
LE0153 # 04 Y:2003 | 04 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,432 | $1,500 | Not Implemented |
LE0153 # 05 Y:2003 | 05 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,189 | $750 | Implemented |
LE0153 # 06 Y:2003 | 06 | 2003 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,948 | $1,000 | Implemented |
LE0153 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $766 | $75 | Implemented |
LE0153 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,976 | $877 | Implemented |
WV0252 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,414 | $0 | Implemented |
WV0252 # 02 Y:2002 | 02 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,346 | $1,200 | Implemented |
WV0252 # 03 Y:2002 | 03 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,869 | $235 | Implemented |
WV0252 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $681 | $235 | Implemented |
WV0252 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,995 | $235 | Implemented |
WV0252 # 06 Y:2002 | 06 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,644 | $261 | Not Implemented |
WV0252 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,432 | $6,714 | Not Implemented |
WV0252 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $553 | $516 | Not Implemented |
WV0252 # 09 Y:2002 | 09 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $40,560 | $500 | Implemented |
WV0252 # 10 Y:2002 | 10 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,714 | $10,000 | Not Implemented |
WV0252 # 11 Y:2002 | 11 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,000 | $1,323 | Not Implemented |
LE0139 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $97,133 | $238,263 | Implemented |
LE0139 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $883 | $2,000 | Not Implemented |
LE0139 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,359 | $0 | Implemented |
LE0139 # 04 Y:2002 | 04 | 2002 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,869 | $7,000 | Not Implemented |
WV0246 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $656 | $600 | Not Implemented |
WV0246 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $249 | $0 | Implemented |
WV0246 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,539 | $0 | Implemented |
WV0246 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,277 | $240 | Implemented |