Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1023 # 03 Y:2020 | 03 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $163 | $0 | Not Implemented |
UD1023 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $33,329 | $14,912 | Not Implemented |
UD1023 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,341 | $0 | Not Implemented |
UD1023 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,275 | $3,000 | Not Implemented |
UD1023 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $605 | $340 | Not Implemented |
UD1023 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,553 | $5,220 | Not Implemented |
UD1023 # 09 Y:2020 | 09 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $936 | $1,600 | Not Implemented |
UD1023 # 10 Y:2020 | 10 | 2020 | INSTALL OCCUPANCY SENSORS | $904 | $560 | Not Implemented |
UD1023 # 11 Y:2020 | 11 | 2020 | REPLACE BOILER | $6,824 | $18,600 | Not Implemented |
UD1022 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,420 | $0 | Not Implemented |
UD1022 # 02 Y:2020 | 02 | 2020 | ADJUST BURNERS FOR EFFICIENT OPERATION | $333,038 | $10,000 | Not Implemented |
UD1022 # 03 Y:2020 | 03 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $39,643 | $10,000 | Not Implemented |
UD1022 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,787 | $14,000 | Not Implemented |
UD1022 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,140 | $340 | Not Implemented |
UD1022 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,150 | $75,000 | Not Implemented |
UD1022 # 07 Y:2020 | 07 | 2020 | INSTALL OCCUPANCY SENSORS | $3,209 | $3,730 | Not Implemented |
UD1022 # 08 Y:2020 | 08 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $64,635 | $158,400 | Not Implemented |
UD1021 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,283 | $0 | Implemented |
UD1021 # 02 Y:2020 | 02 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $32,724 | $0 | Implemented |
UD1021 # 03 Y:2020 | 03 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,965 | $1,400 | Not Implemented |
UD1021 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,342 | $0 | Implemented |
UD1021 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,841 | $0 | Implemented |
UD1021 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,902 | $2,000 | Implemented |
UD1021 # 07 Y:2020 | 07 | 2020 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,594 | $1,590 | Not Implemented |
UD1021 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,419 | $37,053 | Implemented |