Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0178 # 07 Y:1999 | 07 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $10,000 | $200 | Implemented |
SF0178 # 08 Y:1999 | 08 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $7,184 | $3,721 | Not Implemented |
SF0178 # 09 Y:1999 | 09 | 1999 | TREAT AND REUSE RINSE WATERS | $3,340 | $3,269 | Implemented |
SF0178 # 10 Y:1999 | 10 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,484 | $15,374 | Not Implemented |
NV0137 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,544 | $1,000 | Not Implemented |
NV0137 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $372 | $300 | Implemented |
NV0137 # 03 Y:1999 | 03 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $198 | $25 | Implemented |
NV0137 # 04 Y:1999 | 04 | 1999 | USE RADIANT HEATER FOR SPOT HEATING | $2,377 | $4,576 | Not Implemented |
NV0137 # 05 Y:1999 | 05 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $376 | $0 | Not Implemented |
NV0137 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $26,390 | $7,970 | Implemented |
WI0360 # 01 Y:1999 | 01 | 1999 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $24,990 | $0 | Not Implemented |
WI0360 # 02 Y:1999 | 02 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $17,374 | $22,500 | Not Implemented |
WI0360 # 03 Y:1999 | 03 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $15,954 | $16,000 | Not Implemented |
WI0360 # 04 Y:1999 | 04 | 1999 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $7,161 | $40,800 | Not Implemented |
WI0360 # 05 Y:1999 | 05 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,661 | $8,000 | Not Implemented |
WI0360 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,483 | $1,000 | Not Implemented |
WI0360 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,603 | $640 | Not Implemented |
WI0360 # 08 Y:1999 | 08 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,510 | $400 | Implemented |
WI0360 # 09 Y:1999 | 09 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,092 | $500 | Implemented |
WI0360 # 10 Y:1999 | 10 | 1999 | INSTALL OCCUPANCY SENSORS | $2,640 | $5,800 | Implemented |
WI0360 # 11 Y:1999 | 11 | 1999 | REDUCE VENTILATION AIR | $1,891 | $500 | Implemented |
WI0360 # 12 Y:1999 | 12 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $1,735 | $400 | Not Implemented |
WI0360 # 13 Y:1999 | 13 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,148 | $725 | Not Implemented |
AR0174 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $759 | $1,307 | Not Implemented |
AR0174 # 02 Y:1999 | 02 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $176 | $0 | Not Implemented |