IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0489 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,445 $10,800 Implemented
UD0489 # 04 Y:1996 04 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $488 $100 Implemented
UD0489 # 05 Y:1996 05 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,008 $400 Not Implemented
UD0489 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,457 $1,000 Not Implemented
UD0488 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $4,372 $4,000 Implemented
UD0488 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,843 $3,000 Implemented
UD0488 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $997 $2,500 Not Implemented
UD0488 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,037 $8,010 Implemented
UD0487 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,502 $4,000 Not Implemented
UD0487 # 02 Y:1996 02 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,369 $500 Not Implemented
UD0487 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $33,600 $0 Not Implemented
UD0487 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $956 $3,035 Not Implemented
UD0487 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,168 $3,450 Not Implemented
UD0487 # 06 Y:1996 06 1996 RECYCLE CASTING SAND $10,179 $15,000 Not Implemented
UD0486 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $558 $0 Implemented
UD0486 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,870 $0 Implemented
UD0486 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $360 $1,000 Implemented
UD0486 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,390 $7,435 Implemented
UD0486 # 05 Y:1996 05 1996 RECOVER AND REUSE COOLING WATER $2,850 $17,500 Implemented
UD0485 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $600 $0 Implemented
UD0485 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,600 $1,200 Not Implemented
UD0485 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,528 $250 Implemented
UD0485 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,249 $12,150 Implemented
UD0485 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $6,439 $6,000 Not Implemented
UD0485 # 06 Y:1996 06 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $18,918 $6,000 Implemented