IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0299 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $13,442 $36,067 Not Implemented
UF0299 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $65,908 $37,050 Implemented
UF0299 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,494 $0 Implemented
UF0299 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,724 $81,293 Implemented
UF0299 # 07 Y:2002 07 2002 RECOVER WASTE HEAT FROM EQUIPMENT $27,545 $120,962 Not Implemented
UF0299 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $20,543 $0 Implemented
UF0299 # 09 Y:2002 09 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,134 $0 Implemented
UF0299 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $30,592 $15,000 Not Implemented
UF0299 # 11 Y:2002 11 2002 RECYCLE FLUORESCENT LAMPS $63 $0 Implemented
UF0299 # 12 Y:2002 12 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $126,744 $400,000 Not Implemented
UF0299 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,568 $1,487 Implemented
IC0035 # 01 Y:2002 01 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $3,252 $1,500 Not Implemented
IC0035 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $12,947 $2,657 Implemented
IC0035 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $11,300 $7,092 Not Implemented
IC0035 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,174 $1,400 Not Implemented
IC0035 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,103 $83,780 Implemented
IC0035 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,785 $2,130 Not Implemented
IC0035 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $9,366 $6,890 Not Implemented
IC0035 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,977 $4,813 Implemented
IC0035 # 09 Y:2002 09 2002 RECOVER AND REUSE WASTE MATERIAL $97 $120 Implemented
IC0035 # 10 Y:2002 10 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $4,000 $3,500 Implemented
IC0035 # 11 Y:2002 11 2002 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $4,885 $3,000 Not Implemented
IC0035 # 12 Y:2002 12 2002 AUTOMATE PAYROLL SYSTEM $19,800 $8,785 Not Implemented
IA0290 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,977 $829 Implemented
IA0290 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $190 $25 Not Implemented