IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,004

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0246 # 12 Y:2002 12 2002 PAY BILLS ON TIME TO AVOID LATE FEES $2,301 $0 Implemented
WV0245 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,684 $0 Implemented
WV0245 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $348 $151 Implemented
WV0245 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $0 Implemented
WV0245 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $414 $100 Implemented
WV0245 # 05 Y:2002 05 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,015 $230 Implemented
WV0245 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,109 $138 Implemented
WV0245 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,052 $930 Not Implemented
WV0245 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $579 $300 Implemented
WV0245 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,021 $4,000 Not Implemented
WV0245 # 10 Y:2002 10 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,800 $690 Implemented
WV0245 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,000 $845 Not Implemented
WV0244 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,136 $108 Implemented
WV0244 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,433 $900 Implemented
WV0244 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,318 $193 Implemented
WV0244 # 04 Y:2002 04 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $3,380 $4,950 Not Implemented
WV0244 # 05 Y:2002 05 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,244 $19,144 Not Implemented
WV0244 # 06 Y:2002 06 2002 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,994 $10,000 Not Implemented
WV0244 # 07 Y:2002 07 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,266 $4,270 Implemented
WV0244 # 08 Y:2002 08 2002 METER WASTE WATER $29,520 $944 Implemented
WV0244 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,076 $4,000 Not Implemented
WV0244 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,200 $11,000 Not Implemented
WV0237 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,306 $1,855 Implemented
WV0237 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $946 $118 Implemented
WV0237 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,490 $470 Implemented