Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,004
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0246 # 12 Y:2002 | 12 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,301 | $0 | Implemented |
WV0245 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,684 | $0 | Implemented |
WV0245 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $348 | $151 | Implemented |
WV0245 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $945 | $0 | Implemented |
WV0245 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $414 | $100 | Implemented |
WV0245 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,015 | $230 | Implemented |
WV0245 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,109 | $138 | Implemented |
WV0245 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,052 | $930 | Not Implemented |
WV0245 # 08 Y:2002 | 08 | 2002 | USE PHOTOCELL CONTROLS | $579 | $300 | Implemented |
WV0245 # 09 Y:2002 | 09 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,021 | $4,000 | Not Implemented |
WV0245 # 10 Y:2002 | 10 | 2002 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $3,800 | $690 | Implemented |
WV0245 # 11 Y:2002 | 11 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,000 | $845 | Not Implemented |
WV0244 # 01 Y:2002 | 01 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,136 | $108 | Implemented |
WV0244 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $19,433 | $900 | Implemented |
WV0244 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $1,318 | $193 | Implemented |
WV0244 # 04 Y:2002 | 04 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,380 | $4,950 | Not Implemented |
WV0244 # 05 Y:2002 | 05 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,244 | $19,144 | Not Implemented |
WV0244 # 06 Y:2002 | 06 | 2002 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,994 | $10,000 | Not Implemented |
WV0244 # 07 Y:2002 | 07 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,266 | $4,270 | Implemented |
WV0244 # 08 Y:2002 | 08 | 2002 | METER WASTE WATER | $29,520 | $944 | Implemented |
WV0244 # 09 Y:2002 | 09 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $13,076 | $4,000 | Not Implemented |
WV0244 # 10 Y:2002 | 10 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $13,200 | $11,000 | Not Implemented |
WV0237 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,306 | $1,855 | Implemented |
WV0237 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $946 | $118 | Implemented |
WV0237 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,490 | $470 | Implemented |