IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0126 # 03 Y:2017 03 2017 REPLACE BOILER $26,315 $176,427 Not Implemented
UU0126 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,977 $8,120 Not Implemented
UU0126 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,358 $90 Implemented
UU0126 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,423 $2,000 Implemented
UU0125 # 01 Y:2017 01 2017 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,802 $0 Not Implemented
UU0125 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,851 $18,588 Implemented
UU0125 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,110 $20 Not Implemented
UU0125 # 04 Y:2017 04 2017 RECOVER AND REUSE WASTE MATERIAL $6,187 $3,150 Implemented
UU0125 # 05 Y:2017 05 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,417 $39,198 Not Implemented
UU0125 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $4,418 $7,220 Implemented
UU0125 # 07 Y:2017 07 2017 MINIMIZE WATER USAGE $3,700 $200 Implemented
UU0125 # 08 Y:2017 08 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,690 $0 Not Implemented
UU0124 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,503 $0 Implemented
UU0124 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $5,444 $5,000 Implemented
UU0124 # 03 Y:2017 03 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,630 $3,140 Not Implemented
UU0124 # 04 Y:2017 04 2017 REDUCE HEAT GAIN BY WINDOW TINTING $3,392 $10,800 Not Implemented
UU0124 # 05 Y:2017 05 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,833 $4,266 Not Implemented
UU0124 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $980 $0 Implemented
UU0124 # 07 Y:2017 07 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $854 $1,702 Implemented
UU0124 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $681 $1,463 Implemented
UU0124 # 09 Y:2017 09 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $386 $0 Implemented
UU0123 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $22,871 $23,400 Implemented
UU0123 # 02 Y:2017 02 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,624 $13,970 Implemented
UU0123 # 03 Y:2017 03 2017 METER WASTE WATER $4,100 $0 Not Implemented
UU0123 # 04 Y:2017 04 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,374 $5,770 Implemented