Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0126 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $26,315 | $176,427 | Not Implemented |
UU0126 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,977 | $8,120 | Not Implemented |
UU0126 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,358 | $90 | Implemented |
UU0126 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,423 | $2,000 | Implemented |
UU0125 # 01 Y:2017 | 01 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,802 | $0 | Not Implemented |
UU0125 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,851 | $18,588 | Implemented |
UU0125 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,110 | $20 | Not Implemented |
UU0125 # 04 Y:2017 | 04 | 2017 | RECOVER AND REUSE WASTE MATERIAL | $6,187 | $3,150 | Implemented |
UU0125 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,417 | $39,198 | Not Implemented |
UU0125 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $4,418 | $7,220 | Implemented |
UU0125 # 07 Y:2017 | 07 | 2017 | MINIMIZE WATER USAGE | $3,700 | $200 | Implemented |
UU0125 # 08 Y:2017 | 08 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,690 | $0 | Not Implemented |
UU0124 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,503 | $0 | Implemented |
UU0124 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $5,444 | $5,000 | Implemented |
UU0124 # 03 Y:2017 | 03 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,630 | $3,140 | Not Implemented |
UU0124 # 04 Y:2017 | 04 | 2017 | REDUCE HEAT GAIN BY WINDOW TINTING | $3,392 | $10,800 | Not Implemented |
UU0124 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,833 | $4,266 | Not Implemented |
UU0124 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $980 | $0 | Implemented |
UU0124 # 07 Y:2017 | 07 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $854 | $1,702 | Implemented |
UU0124 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $681 | $1,463 | Implemented |
UU0124 # 09 Y:2017 | 09 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $386 | $0 | Implemented |
UU0123 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $22,871 | $23,400 | Implemented |
UU0123 # 02 Y:2017 | 02 | 2017 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,624 | $13,970 | Implemented |
UU0123 # 03 Y:2017 | 03 | 2017 | METER WASTE WATER | $4,100 | $0 | Not Implemented |
UU0123 # 04 Y:2017 | 04 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,374 | $5,770 | Implemented |