Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0383 # 10 Y:2008 | 10 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $11,700 | $11,589 | Implemented |
NC0383 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,695 | $1,497 | Implemented |
NC0383 # 12 Y:2008 | 12 | 2008 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $850 | $750 | Not Implemented |
NC0381 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $80,420 | $183,000 | Not Implemented |
NC0381 # 02 Y:2008 | 02 | 2008 | REPLACE BOILER | $34,528 | $60,000 | Not Implemented |
NC0381 # 03 Y:2008 | 03 | 2008 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,430 | $800 | Implemented |
NC0381 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $1,224 | $1,030 | Implemented |
NC0381 # 05 Y:2008 | 05 | 2008 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $998 | $500 | Implemented |
NC0381 # 06 Y:2008 | 06 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,183 | $4,900 | Not Implemented |
NC0381 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,016 | $100 | Implemented |
NC0381 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,562 | $1,472 | Not Implemented |
NC0381 # 09 Y:2008 | 09 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $1,192 | $1,540 | Not Implemented |
NC0379 # 01 Y:2008 | 01 | 2008 | ADJUST BURNERS FOR EFFICIENT OPERATION | $871 | $800 | Implemented |
NC0379 # 02 Y:2008 | 02 | 2008 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $333 | $100 | Implemented |
NC0379 # 03 Y:2008 | 03 | 2008 | REDUCE VENTILATION AIR | $7,706 | $25,500 | Not Implemented |
NC0379 # 04 Y:2008 | 04 | 2008 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,284 | $3,000 | Implemented |
NC0379 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $237 | $50 | Implemented |
NC0379 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $269 | $100 | Implemented |
NC0379 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $101 | $308 | Implemented |
NC0379 # 08 Y:2008 | 08 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $834 | $1,728 | Implemented |
NC0378 # 01 Y:2008 | 01 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $97,991 | $50,000 | Implemented |
NC0378 # 02 Y:2008 | 02 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $56,045 | $85,000 | Not Implemented |
NC0378 # 03 Y:2008 | 03 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,480 | $500 | Not Implemented |
NC0378 # 04 Y:2008 | 04 | 2008 | REVISE SMOKE CLEANUP FROM OPERATIONS | $2,215 | $7,700 | Not Implemented |
NC0378 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,355 | $7,450 | Not Implemented |