IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0037 # 02 Y:2010 02 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $709 $0 Implemented
UW0037 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $921 $1,842 Not Implemented
UW0040 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $977,184 $420,000 Implemented
UW0040 # 02 Y:2010 02 2010 KEEP BOILER TUBES CLEAN $82,215 $50,000 Implemented
UW0040 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,477 $32,020 Not Implemented
UW0036 # 01 Y:2010 01 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $30,860 $61,720 Not Implemented
UW0036 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,120 $1,590 Not Implemented
UW0036 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $1,039 $1,072 Not Implemented
UW0036 # 04 Y:2010 04 2010 PAY BILLS ON TIME TO AVOID LATE FEES $819 $45 Not Implemented
UW0036 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $417 $825 Not Implemented
UW0041 # 01 Y:2010 01 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,098 $866 Implemented
UW0041 # 02 Y:2010 02 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $653 $1,306 Implemented
UW0041 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $521 $261 Implemented
UW0035 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,000 $0 Not Implemented
UW0035 # 02 Y:2010 02 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $28,000 $77,000 Implemented
UW0035 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,058 $1 Implemented
UW0035 # 04 Y:2010 04 2010 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,417 $0 Not Implemented
UW0035 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $3,700 $2,000 Implemented
UW0034 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $120,000 $0 Not Implemented
UW0034 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,639 $102,000 Implemented
UW0034 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,716 $0 Not Implemented
UW0034 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,749 $115,000 Implemented
UW0034 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,077 $10,000 Implemented
UW0033 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $9,132 $0 Not Implemented
UW0033 # 02 Y:2010 02 2010 DISTILL CONTAMINATED SOLVENTS FOR REUSE $7,344 $0 Not Implemented