IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,175

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0235 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,629 $0 Not Implemented
KU0235 # 06 Y:1987 06 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $935 $1,800 Not Implemented
KU0235 # 07 Y:1987 07 1987 INSTALL AUTOMATIC STACK DAMPER $784 $1,275 Not Implemented
KU0235 # 08 Y:1987 08 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $524 $0 Not Implemented
KU0235 # 09 Y:1987 09 1987 INSULATE BARE EQUIPMENT $643 $150 Not Implemented
KU0235 # 10 Y:1987 10 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $162 $0 Implemented
KU0235 # 11 Y:1987 11 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $131 $50 Not Implemented
KU0236 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,730 $8,946 Implemented
KU0236 # 02 Y:1987 02 1987 INSTALL AUTOMATIC STACK DAMPER $1,183 $1,700 Not Implemented
KU0236 # 03 Y:1987 03 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,055 $0 Implemented
KU0236 # 04 Y:1987 04 1987 IMPROVE LUBRICATION PRACTICES $905 $0 Not Implemented
KU0236 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $725 $0 Implemented
KU0236 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $0 Not Implemented
KU0236 # 07 Y:1987 07 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $691 $1,000 Not Implemented
KU0236 # 08 Y:1987 08 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $120 Implemented
KU0236 # 09 Y:1987 09 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $194 $40 Not Implemented
KU0236 # 10 Y:1987 10 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $172 $120 Implemented
LT0095 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,800 $19,000 Not Implemented
LT0095 # 02 Y:1987 02 1987 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $1,183 $0 Not Implemented
LT0095 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $23,600 $0 Not Implemented
LT0095 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,900 $0 Not Implemented
MA0098 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $977 $116 Implemented
MA0098 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,853 $2,000 Implemented
AM0007 # 01 Y:1987 01 1987 OPTIMIZE PLANT POWER FACTOR $1,648 $5,000 Implemented
AM0007 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $520 Not Implemented