IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0377 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,146 $800 Implemented
TN0377 # 07 Y:1989 07 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,960 $200 Implemented
TN0377 # 08 Y:1989 08 1989 KEEP LAMPS AND REFLECTORS CLEAN $3,394 $11,235 Not Implemented
TN0377 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,489 $3,870 Implemented
TN0379 # 01 Y:1989 01 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $23,137 $2,100 Not Implemented
TN0379 # 02 Y:1989 02 1989 KEEP LAMPS AND REFLECTORS CLEAN $20,544 $37,163 Not Implemented
TN0379 # 03 Y:1989 03 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,703 $0 Not Implemented
TN0379 # 04 Y:1989 04 1989 USE MINIMUM STEAM OPERATING PRESSURE $1,190 $0 Not Implemented
TN0379 # 05 Y:1989 05 1989 REPAIR AND ELIMINATE STEAM LEAKS $452 $330 Not Implemented
TN0379 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $483 $757 Not Implemented
TN0379 # 07 Y:1989 07 1989 IMPROVE LUBRICATION PRACTICES $2,421 $1,200 Not Implemented
TN0379 # 08 Y:1989 08 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,954 $3,952 Not Implemented
TN0379 # 09 Y:1989 09 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $144 $111 Not Implemented
TN0379 # 10 Y:1989 10 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,198 $0 Not Implemented
UD0298 # 01 Y:1989 01 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $979 $2,250 Implemented
UD0298 # 02 Y:1989 02 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,921 $1,500 Not Implemented
UD0299 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,009 $0 Not Implemented
UD0299 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $900 $0 Implemented
UD0299 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,667 $750 Implemented
UD0299 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $889 $750 Implemented
UD0299 # 05 Y:1989 05 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,588 $1,720 Implemented
UD0300 # 01 Y:1989 01 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,966 $0 Not Implemented
UD0300 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,322 $0 Not Implemented
UD0300 # 03 Y:1989 03 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,860 $25,000 Not Implemented
UD0300 # 04 Y:1989 04 1989 INSTALL SET-BACK TIMERS $3,801 $0 Implemented