IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0413 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $710 $850 Not Implemented
KU0315 # 01 Y:1990 01 1990 RECOVER AND REUSE COOLING WATER $4,123 $7,000 Implemented
KU0315 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $100 Implemented
KU0315 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $1,130 $640 Implemented
KU0315 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $518 $900 Not Implemented
KU0315 # 05 Y:1990 05 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,282 $100 Implemented
KU0316 # 01 Y:1990 01 1990 INSTALL SET-BACK TIMERS $3,487 $2,075 Implemented
KU0316 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $1,005 Implemented
KU0316 # 03 Y:1990 03 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,122 $15,000 Implemented
KU0316 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,990 $7,200 Not Implemented
KU0316 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $2,160 $2,250 Implemented
KU0316 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,034 $1,000 Implemented
KU0316 # 07 Y:1990 07 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $117 $0 Not Implemented
KU0317 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $206 Implemented
KU0317 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $240 Implemented
KU0317 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,311 $1,400 Implemented
KU0317 # 04 Y:1990 04 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $453 $0 Not Implemented
KU0317 # 05 Y:1990 05 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $571 $950 Not Implemented
KU0318 # 01 Y:1990 01 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $39,803 $0 Implemented
KU0318 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,872 $1,000 Implemented
KU0318 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $741 Implemented
KU0318 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74 $90 Implemented
KU0318 # 05 Y:1990 05 1990 RECOVER AND REUSE COOLING WATER $65,074 $27,000 Not Implemented
KU0318 # 06 Y:1990 06 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $61,404 $0 Implemented
KU0318 # 07 Y:1990 07 1990 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $1,283 $3,200 Not Implemented