Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0295 # 06 Y:2004 | 06 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $23,382 | $48,990 | Not Implemented |
SF0295 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $529 | $3,076 | Not Implemented |
WI0479 # 01 Y:2004 | 01 | 2004 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $16,108 | $12,000 | Not Implemented |
WI0479 # 02 Y:2004 | 02 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,744 | $18,000 | Not Implemented |
WI0479 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,122 | $11,520 | n/a |
WI0479 # 04 Y:2004 | 04 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,229 | $0 | Not Implemented |
WI0479 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,022 | $0 | Implemented |
WI0479 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $1,186 | $774 | Not Implemented |
WI0479 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $670 | $640 | Not Implemented |
WI0479 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $667 | $1,020 | Not Implemented |
AM0473 # 01 Y:2004 | 01 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $13,275 | $2,300 | Implemented |
AM0473 # 02 Y:2004 | 02 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,780 | $2,320 | Implemented |
AM0473 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,210 | $400 | Implemented |
AM0473 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $515 | $1,270 | Not Implemented |
AM0473 # 05 Y:2004 | 05 | 2004 | INSTALL SKYLIGHTS | $360 | $0 | Not Implemented |
AM0473 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $350 | $290 | Not Implemented |
AM0473 # 07 Y:2004 | 07 | 2004 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $13,980 | $5,590 | Implemented |
AM0473 # 08 Y:2004 | 08 | 2004 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $18,434 | $5,500 | Implemented |
BD0268 # 01 Y:2004 | 01 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $352,557 | $1,500,000 | Implemented |
BD0268 # 02 Y:2004 | 02 | 2004 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $81,415 | $130,000 | Implemented |
BD0268 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $40,434 | $49,000 | Implemented |
BD0268 # 04 Y:2004 | 04 | 2004 | HEAT WATER WITH EXHAUST HEAT | $31,790 | $35,000 | Implemented |
BD0268 # 05 Y:2004 | 05 | 2004 | ADD AREA LIGHTING SWITCHES | $14,266 | $9,000 | Not Implemented |
BD0268 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,170 | $200 | Implemented |
BD0268 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,701 | $1,500 | Implemented |