IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0295 # 06 Y:2004 06 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,382 $48,990 Not Implemented
SF0295 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $529 $3,076 Not Implemented
WI0479 # 01 Y:2004 01 2004 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $16,108 $12,000 Not Implemented
WI0479 # 02 Y:2004 02 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,744 $18,000 Not Implemented
WI0479 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,122 $11,520 n/a
WI0479 # 04 Y:2004 04 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,229 $0 Not Implemented
WI0479 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,022 $0 Implemented
WI0479 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,186 $774 Not Implemented
WI0479 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $670 $640 Not Implemented
WI0479 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $667 $1,020 Not Implemented
AM0473 # 01 Y:2004 01 2004 INSTALL TIMERS AND/OR THERMOSTATS $13,275 $2,300 Implemented
AM0473 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,780 $2,320 Implemented
AM0473 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,210 $400 Implemented
AM0473 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $1,270 Not Implemented
AM0473 # 05 Y:2004 05 2004 INSTALL SKYLIGHTS $360 $0 Not Implemented
AM0473 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $350 $290 Not Implemented
AM0473 # 07 Y:2004 07 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,980 $5,590 Implemented
AM0473 # 08 Y:2004 08 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $18,434 $5,500 Implemented
BD0268 # 01 Y:2004 01 2004 AIR CONDITION ONLY SPACE NECESSARY $352,557 $1,500,000 Implemented
BD0268 # 02 Y:2004 02 2004 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $81,415 $130,000 Implemented
BD0268 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $40,434 $49,000 Implemented
BD0268 # 04 Y:2004 04 2004 HEAT WATER WITH EXHAUST HEAT $31,790 $35,000 Implemented
BD0268 # 05 Y:2004 05 2004 ADD AREA LIGHTING SWITCHES $14,266 $9,000 Not Implemented
BD0268 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,170 $200 Implemented
BD0268 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,701 $1,500 Implemented