IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0573 # 03 Y:2011 03 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,064 $7,045 Not Implemented
OR0573 # 04 Y:2011 04 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,821 $7,045 Not Implemented
OR0573 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $11,543 $7,806 Implemented
OR0573 # 06 Y:2011 06 2011 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $71,712 $65,575 Not Implemented
OR0573 # 07 Y:2011 07 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $987 $4,800 Not Implemented
UF0445 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,864 $4,542 Implemented
UF0445 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,543 $9,823 Not Implemented
UF0445 # 03 Y:2011 03 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,693 $939 Not Implemented
UF0445 # 04 Y:2011 04 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $25,323 $75,000 Implemented
UF0445 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $43,678 $2,580 Not Implemented
UF0445 # 06 Y:2011 06 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,582 $2,580 Implemented
UF0445 # 07 Y:2011 07 2011 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $802 $1,378 Not Implemented
UF0445 # 08 Y:2011 08 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $735 $1,280 Not Implemented
UF0445 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,370 $8,778 Implemented
UF0445 # 10 Y:2011 10 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $118,931 $150,000 Not Implemented
IA0470 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $1,446 $2,556 Implemented
IA0470 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,520 $63,232 Implemented
IA0470 # 03 Y:2011 03 2011 USE PHOTOCELL CONTROLS $208 $210 Implemented
IA0470 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $1,038 $144 Implemented
IA0470 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,631 $15,000 Not Implemented
LE0322 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,515 $1,000 Implemented
LE0322 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,000 $8,500 Implemented
AM0601 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,600 $500 Not Implemented
AM0601 # 02 Y:2011 02 2011 USE MAGNETIC TECHNOLOGY TO TREAT WATER $4,500 $3,090 Not Implemented
AM0601 # 03 Y:2011 03 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,800 $0 Not Implemented