Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1213 # 08 Y:2012 | 08 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $654 | $337 | Implemented |
UK1213 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $316 | $327 | Not Implemented |
UK1213 # 10 Y:2012 | 10 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $49,180 | $6,650 | Not Implemented |
UK1213 # 11 Y:2012 | 11 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,482 | $988 | Not Implemented |
UK1213 # 12 Y:2012 | 12 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,563 | $4,550 | Implemented |
CO0666 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,240 | $155,860 | Not Implemented |
CO0666 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,710 | $1,000 | Implemented |
CO0666 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,090 | $430 | Not Implemented |
CO0666 # 04 Y:2012 | 04 | 2012 | OPTIMIZE PLANT POWER FACTOR | $30,160 | $56,610 | Not Implemented |
CO0666 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,630 | $32,970 | Not Implemented |
CO0666 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,730 | $13,270 | Not Implemented |
OK0832 # 01 Y:2012 | 01 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,902 | $7,700 | Not Implemented |
OK0832 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $955 | $1,288 | Not Implemented |
OK0832 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $995 | $6,375 | Not Implemented |
OK0832 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $655 | $4,180 | Not Implemented |
OK0832 # 05 Y:2012 | 05 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $18,428 | $7,200 | Not Implemented |
OK0832 # 06 Y:2012 | 06 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,382 | $34,962 | Not Implemented |
OK0832 # 07 Y:2012 | 07 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $6,074 | $29,738 | Not Implemented |
OK0832 # 08 Y:2012 | 08 | 2012 | INSTALL SET-BACK TIMERS | $2,158 | $185 | Not Implemented |
OK0832 # 09 Y:2012 | 09 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,579 | $1,170 | Implemented |
OK0832 # 10 Y:2012 | 10 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,669 | $696 | Not Implemented |
OK0832 # 11 Y:2012 | 11 | 2012 | OPTIMIZE PLANT POWER FACTOR | $1,632 | $8,864 | Not Implemented |
WV0457 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,854 | $6,400 | Not Implemented |
WV0457 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,986 | $22,500 | Implemented |
WV0457 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,482 | $500 | Implemented |