IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1213 # 08 Y:2012 08 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $654 $337 Implemented
UK1213 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $316 $327 Not Implemented
UK1213 # 10 Y:2012 10 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $49,180 $6,650 Not Implemented
UK1213 # 11 Y:2012 11 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,482 $988 Not Implemented
UK1213 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,563 $4,550 Implemented
CO0666 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,240 $155,860 Not Implemented
CO0666 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,710 $1,000 Implemented
CO0666 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,090 $430 Not Implemented
CO0666 # 04 Y:2012 04 2012 OPTIMIZE PLANT POWER FACTOR $30,160 $56,610 Not Implemented
CO0666 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,630 $32,970 Not Implemented
CO0666 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,730 $13,270 Not Implemented
OK0832 # 01 Y:2012 01 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,902 $7,700 Not Implemented
OK0832 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $955 $1,288 Not Implemented
OK0832 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $995 $6,375 Not Implemented
OK0832 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $655 $4,180 Not Implemented
OK0832 # 05 Y:2012 05 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,428 $7,200 Not Implemented
OK0832 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,382 $34,962 Not Implemented
OK0832 # 07 Y:2012 07 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,074 $29,738 Not Implemented
OK0832 # 08 Y:2012 08 2012 INSTALL SET-BACK TIMERS $2,158 $185 Not Implemented
OK0832 # 09 Y:2012 09 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,579 $1,170 Implemented
OK0832 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,669 $696 Not Implemented
OK0832 # 11 Y:2012 11 2012 OPTIMIZE PLANT POWER FACTOR $1,632 $8,864 Not Implemented
WV0457 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,854 $6,400 Not Implemented
WV0457 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,986 $22,500 Implemented
WV0457 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,482 $500 Implemented