Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0197 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,650 | $4,800 | Implemented |
IC0197 # 04 Y:2017 | 04 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $10,402 | $8,241 | Implemented |
IC0197 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,986 | $2,550 | Not Implemented |
IC0197 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,402 | $12,724 | Not Implemented |
OK0974 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $12,407 | $15,373 | Not Implemented |
OK0974 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,219 | $12,710 | Not Implemented |
OK0974 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,588 | $7,868 | Not Implemented |
OK0974 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,524 | $11,407 | Not Implemented |
OK0974 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,726 | $0 | Not Implemented |
OK0974 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $975 | $691 | Not Implemented |
OK0974 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $414 | $0 | Not Implemented |
OK0974 # 08 Y:2017 | 08 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $309 | $191 | Not Implemented |
OK0974 # 09 Y:2017 | 09 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,589 | $11,640 | Not Implemented |
WM0111 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $135,557 | $350,000 | Not Implemented |
WM0111 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,256 | $90,000 | Not Implemented |
WM0111 # 03 Y:2017 | 03 | 2017 | USE SYNTHETIC LUBRICANT | $30,600 | $7,500 | Not Implemented |
WM0111 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,084 | $45,000 | Not Implemented |
WM0111 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,424 | $56,250 | Not Implemented |
WM0111 # 06 Y:2017 | 06 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,506 | $73,860 | Not Implemented |
IP0089 # 01 Y:2017 | 01 | 2017 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $21,884 | $224 | Implemented |
IP0089 # 02 Y:2017 | 02 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,005 | $186 | Not Implemented |
IP0089 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,654 | $396 | Implemented |
IP0089 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $989 | $190 | Not Implemented |
IP0089 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $1,298 | $1,953 | Implemented |
IP0089 # 06 Y:2017 | 06 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $332 | $529 | Not Implemented |