IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0007 # 08 Y:2022 08 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $15,506 $58,000 n/a
CC0007 # 09 Y:2022 09 2022 REPAIR AND ELIMINATE STEAM LEAKS $8,453 $500 n/a
UW2208 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $643 $0 Implemented
UW2208 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $2,680 Implemented
UW2208 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,686 $122 Implemented
UW2208 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $2,080 Implemented
KS2207 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $28,812 $1,600 Implemented
KS2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,721 $18,007 Implemented
KS2207 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,500 $5,480 Not Implemented
KS2207 # 04 Y:2022 04 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,371 $2,138 Implemented
KS2207 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,662 $2,460 Not Implemented
KS2207 # 06 Y:2022 06 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,202 $0 Implemented
KS2207 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $589,910 $5,416,800 Not Implemented
NL0073 # 01 Y:2022 01 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,217 $225,000 Implemented
NL0073 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,537 $35,000 Implemented
NL0073 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,239 $1,398 Not Implemented
NL0073 # 04 Y:2022 04 2022 USE OTHER WASTE CONCENTRATION METHODS $1,144 $1,258 Implemented
NL0073 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $772 $58 Implemented
TT0281 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $58,911 $10,000 Not Implemented
TT0281 # 02 Y:2022 02 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $24,436 $109,567 Not Implemented
TT0281 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $12,034 $44,013 Not Implemented
TT0281 # 04 Y:2022 04 2022 AIR CONDITION ONLY SPACE NECESSARY $5,133 $6,000 Not Implemented
TT0281 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,821 $4,500 Not Implemented
TT0281 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,419 $2,740 Not Implemented
TT0281 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,188 $560 Not Implemented