Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0007 # 08 Y:2022 | 08 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $15,506 | $58,000 | n/a |
CC0007 # 09 Y:2022 | 09 | 2022 | REPAIR AND ELIMINATE STEAM LEAKS | $8,453 | $500 | n/a |
UW2208 # 01 Y:2022 | 01 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $643 | $0 | Implemented |
UW2208 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $2,680 | Implemented |
UW2208 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,686 | $122 | Implemented |
UW2208 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,664 | $2,080 | Implemented |
KS2207 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $28,812 | $1,600 | Implemented |
KS2207 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,721 | $18,007 | Implemented |
KS2207 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,500 | $5,480 | Not Implemented |
KS2207 # 04 Y:2022 | 04 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,371 | $2,138 | Implemented |
KS2207 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,662 | $2,460 | Not Implemented |
KS2207 # 06 Y:2022 | 06 | 2022 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,202 | $0 | Implemented |
KS2207 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $589,910 | $5,416,800 | Not Implemented |
NL0073 # 01 Y:2022 | 01 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $16,217 | $225,000 | Implemented |
NL0073 # 02 Y:2022 | 02 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,537 | $35,000 | Implemented |
NL0073 # 03 Y:2022 | 03 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,239 | $1,398 | Not Implemented |
NL0073 # 04 Y:2022 | 04 | 2022 | USE OTHER WASTE CONCENTRATION METHODS | $1,144 | $1,258 | Implemented |
NL0073 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $772 | $58 | Implemented |
TT0281 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $58,911 | $10,000 | Not Implemented |
TT0281 # 02 Y:2022 | 02 | 2022 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $24,436 | $109,567 | Not Implemented |
TT0281 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,034 | $44,013 | Not Implemented |
TT0281 # 04 Y:2022 | 04 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $5,133 | $6,000 | Not Implemented |
TT0281 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,821 | $4,500 | Not Implemented |
TT0281 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,419 | $2,740 | Not Implemented |
TT0281 # 07 Y:2022 | 07 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,188 | $560 | Not Implemented |