IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0021 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,355 $0 Implemented
NL0021 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,774 $15,206 Implemented
NL0021 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $1,000 Implemented
UD0985 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,113 $0 Implemented
UD0985 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,260 $1,000 Implemented
UD0985 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $957 $2,500 Implemented
UD0985 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $938 $0 Not Implemented
UD0985 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $1,500 Not Implemented
UD0985 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,998 $55,816 Implemented
UD0985 # 07 Y:2018 07 2018 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,420 $25,000 Implemented
SF0519 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,215 $160 Not Implemented
SF0519 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $376 $120 Not Implemented
SF0519 # 03 Y:2018 03 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,348 $20,000 Not Implemented
SF0519 # 04 Y:2018 04 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,597 $2,408 Not Implemented
SF0519 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,990 $19,331 Not Implemented
SF0519 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $9,168 $23,469 Implemented
SF0519 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,309 $55,280 Not Implemented
SF0519 # 08 Y:2018 08 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,974 $34,820 Not Implemented
SF0519 # 09 Y:2018 09 2018 RECYCLE WHITE WATER $16,021 $7,759 Not Implemented
OR0700 # 01 Y:2018 01 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,430 $1,495 Not Implemented
OR0700 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,059 $6,826 Not Implemented
OR0700 # 03 Y:2018 03 2018 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $2,175 $5,389 Not Implemented
LS1806 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $168 $100 Not Implemented
LS1806 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11 $9 Not Implemented
LS1806 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,834 $13,581 Not Implemented