Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0452 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,856 | $4,320 | Not Implemented |
UD0452 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $680 | $880 | Not Implemented |
UD0451 # 01 Y:1995 | 01 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $11,837 | $2,000 | Implemented |
UD0451 # 02 Y:1995 | 02 | 1995 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $17,100 | $0 | Implemented |
UD0451 # 03 Y:1995 | 03 | 1995 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,981 | $4,440 | Not Implemented |
UD0451 # 04 Y:1995 | 04 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,000 | $26,000 | Not Implemented |
UD0450 # 01 Y:1995 | 01 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,163 | $0 | Implemented |
UD0450 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,096 | $2,000 | Implemented |
UD0450 # 03 Y:1995 | 03 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,103 | $2,000 | Implemented |
UD0450 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,449 | $10,000 | Not Implemented |
UD0450 # 05 Y:1995 | 05 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $980 | $250 | Not Implemented |
UD0450 # 06 Y:1995 | 06 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,370 | $2,500 | Not Implemented |
UD0450 # 07 Y:1995 | 07 | 1995 | METER WASTE WATER | $61,699 | $2,000 | Implemented |
UD0450 # 08 Y:1995 | 08 | 1995 | MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING | $24,424 | $0 | Not Implemented |
UD0450 # 09 Y:1995 | 09 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,319 | $0 | Not Implemented |
UD0449 # 01 Y:1994 | 01 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,945 | $250 | Implemented |
UD0449 # 02 Y:1994 | 02 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,532 | $0 | Implemented |
UD0449 # 03 Y:1994 | 03 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,439 | $0 | Implemented |
UD0449 # 04 Y:1994 | 04 | 1994 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,258 | $0 | Implemented |
UD0449 # 05 Y:1994 | 05 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,815 | $0 | Implemented |
UD0449 # 06 Y:1994 | 06 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,846 | $4,234 | Not Implemented |
UD0448 # 01 Y:1994 | 01 | 1994 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,413 | $20,000 | Implemented |
UD0448 # 02 Y:1994 | 02 | 1994 | REDUCE VENTILATION AIR | $1,250 | $2,500 | Not Implemented |
UD0448 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,068 | $10,425 | Implemented |
UD0448 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,798 | $6,200 | Implemented |