Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,004
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0237 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,170 | $324 | Not Implemented |
WV0237 # 05 Y:2002 | 05 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,375 | $174 | Not Implemented |
WV0237 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,506 | $47 | Implemented |
WV0237 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,358 | $100 | Implemented |
WV0237 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,569 | $242 | Implemented |
WV0237 # 09 Y:2002 | 09 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $892 | $1,898 | Not Implemented |
WV0237 # 10 Y:2002 | 10 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $10,991 | $297 | Implemented |
WV0237 # 11 Y:2002 | 11 | 2002 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,336 | $2,223 | Not Implemented |
WV0237 # 12 Y:2002 | 12 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $15,600 | $100 | Implemented |
WV0237 # 13 Y:2002 | 13 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,700 | $300 | Implemented |
WV0237 # 14 Y:2002 | 14 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $14,316 | $500 | Implemented |
WV0237 # 15 Y:2002 | 15 | 2002 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $11,731 | $3,228 | Not Implemented |
WV0237 # 16 Y:2002 | 16 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $2,505 | Not Implemented |
OD0149 # 01 Y:1999 | 01 | 1999 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $26,618 | $64,698 | Not Implemented |
OD0149 # 02 Y:1999 | 02 | 1999 | REPAIR OR REPLACE STEAM TRAPS | $10,071 | $450 | Not Implemented |
OD0149 # 03 Y:1999 | 03 | 1999 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,940 | $1,972 | Not Implemented |
OD0149 # 04 Y:1999 | 04 | 1999 | METER WASTE WATER | $3,741 | $4,595 | Not Implemented |
OD0149 # 05 Y:1999 | 05 | 1999 | RECOVER AND REUSE COOLING WATER | $17,077 | $10,098 | Not Implemented |
WV0161 # 01 Y:1999 | 01 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $199 | $250 | Not Implemented |
WV0161 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $619 | $160 | Implemented |
WV0161 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,368 | $15 | Implemented |
WV0161 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,060 | $15 | Implemented |
WV0161 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $486 | $100 | Implemented |
WV0161 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,728 | $740 | Not Implemented |
WV0161 # 07 Y:1999 | 07 | 1999 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,666 | $4,400 | Not Implemented |