Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,767
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0190 # 04 Y:2017 | 04 | 2017 | OPTIMIZE PLANT POWER FACTOR | $3,337 | $8,000 | Not Implemented |
TT0190 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $280 | $1,000 | Not Implemented |
TT0190 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $88 | $200 | Implemented |
TT0189 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,177 | $3,050 | Implemented |
TT0189 # 02 Y:2017 | 02 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $11,026 | $14,000 | Not Implemented |
TT0189 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,767 | $4,837 | Implemented |
TT0189 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,128 | $125 | Not Implemented |
TT0189 # 05 Y:2017 | 05 | 2017 | INSULATE BARE EQUIPMENT | $864 | $2,140 | Implemented |
TT0189 # 06 Y:2017 | 06 | 2017 | REDUCE EXCESS STEAM BLEEDING | $224 | $225 | Not Implemented |
TT0188 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $23,768 | $97,975 | Not Implemented |
TT0188 # 02 Y:2017 | 02 | 2017 | USE POWER DURING OFF-PEAK PERIODS | $10,583 | $100 | Implemented |
TT0188 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,331 | $8,433 | Not Implemented |
TT0188 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,153 | $890 | Implemented |
TT0188 # 05 Y:2017 | 05 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $684 | $450 | Not Implemented |
TT0186 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,574 | $5,800 | Implemented |
TT0186 # 04 Y:2017 | 04 | 2017 | REDUCE EXCESS STEAM BLEEDING | $38,730 | $4,000 | Not Implemented |
TT0186 # 05 Y:2017 | 05 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $12,015 | $33,000 | Implemented |
TT0186 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $587 | $1,123 | Not Implemented |
TT0186 # 07 Y:2017 | 07 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $543 | $200 | Not Implemented |
TT0186 # 01 Y:2017 | 01 | 2017 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $684,912 | $1,500,000 | Not Implemented |
TT0186 # 02 Y:2017 | 02 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $78,651 | $90,000 | Implemented |
TT0185 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $173,199 | $5,000 | Implemented |
TT0185 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $114,605 | $150,000 | Implemented |
TT0185 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,276 | $1,250 | Implemented |
TT0185 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,670 | $10,600 | Not Implemented |