IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0190 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $3,337 $8,000 Not Implemented
TT0190 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $280 $1,000 Not Implemented
TT0190 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $88 $200 Implemented
TT0189 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,177 $3,050 Implemented
TT0189 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $11,026 $14,000 Not Implemented
TT0189 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,767 $4,837 Implemented
TT0189 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,128 $125 Not Implemented
TT0189 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $864 $2,140 Implemented
TT0189 # 06 Y:2017 06 2017 REDUCE EXCESS STEAM BLEEDING $224 $225 Not Implemented
TT0188 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $23,768 $97,975 Not Implemented
TT0188 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $10,583 $100 Implemented
TT0188 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,331 $8,433 Not Implemented
TT0188 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,153 $890 Implemented
TT0188 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $684 $450 Not Implemented
TT0186 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,574 $5,800 Implemented
TT0186 # 04 Y:2017 04 2017 REDUCE EXCESS STEAM BLEEDING $38,730 $4,000 Not Implemented
TT0186 # 05 Y:2017 05 2017 UPGRADE CONTROLS ON COMPRESSORS $12,015 $33,000 Implemented
TT0186 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $587 $1,123 Not Implemented
TT0186 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $543 $200 Not Implemented
TT0186 # 01 Y:2017 01 2017 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $684,912 $1,500,000 Not Implemented
TT0186 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $78,651 $90,000 Implemented
TT0185 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $173,199 $5,000 Implemented
TT0185 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $114,605 $150,000 Implemented
TT0185 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,276 $1,250 Implemented
TT0185 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,670 $10,600 Not Implemented