Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0151 # 09 Y:1998 | 09 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $187,200 | $36,000 | Implemented |
SF0151 # 10 Y:1998 | 10 | 1998 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $2,120 | $6,210 | Not Implemented |
WI0335 # 01 Y:1998 | 01 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $54,000 | $20,000 | Not Implemented |
WI0335 # 02 Y:1998 | 02 | 1998 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $7,600 | $0 | Implemented |
WI0335 # 03 Y:1998 | 03 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $5,103 | $1,400 | Implemented |
WI0335 # 04 Y:1998 | 04 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,015 | $8,000 | Implemented |
WI0335 # 05 Y:1998 | 05 | 1998 | INSTALL OCCUPANCY SENSORS | $4,802 | $7,200 | Not Implemented |
WI0335 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $468 | $640 | Implemented |
OD0121 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,192 | $6,908 | Implemented |
OD0121 # 02 Y:1998 | 02 | 1998 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,843 | $9,910 | Not Implemented |
OD0121 # 03 Y:1998 | 03 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $241 | $420 | Implemented |
OD0121 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $365 | $220 | Implemented |
OD0121 # 05 Y:1998 | 05 | 1998 | REPAIR OR REPLACE STEAM TRAPS | $672 | $110 | Implemented |
OD0121 # 06 Y:1998 | 06 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,833 | $1,495 | Implemented |
OD0121 # 07 Y:1998 | 07 | 1998 | INSTALL STEAM TRAP | $1,445 | $560 | Not Implemented |
OD0121 # 08 Y:1998 | 08 | 1998 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $10,017 | $2,800 | Implemented |
AS0236 # 05 Y:1998 | 05 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,954 | $3,800 | Not Implemented |
AS0236 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $266 | $60 | Not Implemented |
AS0236 # 07 Y:1998 | 07 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,433 | $9,200 | Not Implemented |
AS0236 # 08 Y:1998 | 08 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $3,018 | $1,725 | Not Implemented |
AS0236 # 09 Y:1998 | 09 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $120 | $60 | Not Implemented |
AS0236 # 10 Y:1998 | 10 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $6,934 | $1,560 | Not Implemented |
AS0236 # 11 Y:1998 | 11 | 1998 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $46,400 | $2,180 | Not Implemented |
AS0236 # 12 Y:1998 | 12 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $1,487,526 | $600,000 | Not Implemented |
AS0236 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,320 | $12,169 | Not Implemented |