IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0474 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70 $0 Implemented
CO0474 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $329,200 $60,000 Implemented
CO0474 # 06 Y:2000 06 2000 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $2,400 $0 Not Implemented
DS0175 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $3,708 $1,337 Not Implemented
DS0175 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $725 $96 Not Implemented
DS0175 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $1,540 $2,100 Implemented
DS0175 # 04 Y:2000 04 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,005 $330 Implemented
DS0175 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $832 $4,230 Not Implemented
DS0175 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $66,482 $72,000 Not Implemented
MA0474 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,827 $1,000 Implemented
MA0474 # 02 Y:2000 02 2000 INSTALL TIMERS AND/OR THERMOSTATS $4,760 $0 Implemented
MA0474 # 03 Y:2000 03 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,838 $13,000 Not Implemented
MA0474 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $746 $4,000 Not Implemented
MA0474 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $512 $1,000 Implemented
MA0474 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $371 $100 Implemented
HO0237 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,410 $11,135 Not Implemented
HO0237 # 02 Y:2000 02 2000 CONDENSE OPERATION INTO ONE BUILDING $91,200 $1,000 Not Implemented
HO0237 # 03 Y:2000 03 2000 IMPROVE SPACE COMFORT CONDITIONING $8,731 $1,000 Not Implemented
HO0237 # 04 Y:2000 04 2000 INSTALL SYSTEM TO COLLECT SCRAP $5,780 $6,240 Not Implemented
HO0237 # 05 Y:2000 05 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $7,800 $5,000 Not Implemented
HO0237 # 06 Y:2000 06 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,880 $480 Not Implemented
HO0237 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $9,464 $7,000 Not Implemented
HO0237 # 08 Y:2000 08 2000 IMPROVE SPACE COMFORT CONDITIONING $2,520 $1,000 Implemented
HO0237 # 09 Y:2000 09 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,980 $200 Not Implemented
NC0203 # 01 Y:2000 01 2000 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $5,811 $13,000 Implemented