Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0302 # 05 Y:2002 | 05 | 2002 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $13,521 | $5,000 | Not Implemented |
IA0302 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,236 | $665 | Implemented |
SU0143 # 01 Y:2002 | 01 | 2002 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $29,798 | $32,697 | Implemented |
SU0143 # 02 Y:2002 | 02 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $4,584 | $10,455 | Implemented |
SU0143 # 03 Y:2002 | 03 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,371 | $3,000 | Implemented |
SU0143 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,432 | $300 | Not Implemented |
SU0143 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,656 | $420 | Implemented |
SU0143 # 06 Y:2002 | 06 | 2002 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $42,656 | $128,836 | Not Implemented |
WI0429 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $49,518 | $23,000 | Not Implemented |
WI0429 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $11,200 | $25,000 | Not Implemented |
WI0429 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $3,559 | $2,900 | Not Implemented |
WI0429 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,146 | $1,280 | Not Implemented |
WI0429 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $514 | $150 | Implemented |
UF0312 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,162 | $7,981 | Implemented |
UF0312 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $1,258 | $6,000 | Not Implemented |
UF0312 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,934 | $500 | Not Implemented |
UF0312 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,427 | $20,000 | Implemented |
UF0312 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,400 | $31,277 | Not Implemented |
UF0312 # 06 Y:2002 | 06 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,131 | $1,074 | Implemented |
OK0645 # 01 Y:2002 | 01 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,346 | $2,900 | Not Implemented |
OK0645 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,887 | $220 | Implemented |
OK0645 # 03 Y:2002 | 03 | 2002 | MODIFY WORKLOAD | $10,443 | $5,600 | Not Implemented |
OK0645 # 04 Y:2002 | 04 | 2002 | MOVE PRODUCT USING MECHANICAL MEANS | $22,600 | $10,000 | Not Implemented |
OK0645 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $176 | $163 | Implemented |
OK0645 # 06 Y:2002 | 06 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $61,280 | $44,000 | Implemented |