IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0382 # 05 Y:2008 05 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,226 $0 Implemented
NC0382 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $1,644 $2,483 Implemented
NC0382 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $4,408 Implemented
SF0363 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,927 $0 Implemented
SF0363 # 02 Y:2008 02 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $968 $1,145 Implemented
SF0363 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,754 $3,506 Implemented
SF0363 # 04 Y:2008 04 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,525 $14,831 Not Implemented
SF0363 # 05 Y:2008 05 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,481 $69,656 Not Implemented
IC0146 # 01 Y:2008 01 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,678 $1,537 Not Implemented
IC0146 # 02 Y:2008 02 2008 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,159 $0 Implemented
IC0146 # 03 Y:2008 03 2008 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $24,543 $208,785 Implemented
IC0146 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,453 $0 Not Implemented
IC0146 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $0 Not Implemented
IC0146 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,631 $729 Implemented
IC0146 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $211 Implemented
IC0146 # 08 Y:2008 08 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $541 $0 Implemented
IC0146 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $1,535 $3,688 Implemented
IC0146 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $487 $424 Implemented
IC0146 # 11 Y:2008 11 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $679 $0 Implemented
IC0146 # 12 Y:2008 12 2008 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $27,915 $32,868 Not Implemented
IC0146 # 13 Y:2008 13 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,315 $0 Not Implemented
NC0383 # 01 Y:2008 01 2008 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $16,582 $1,000 Implemented
NC0383 # 02 Y:2008 02 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $38,474 $0 Implemented
NC0383 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $42,558 $50,000 Implemented
NC0383 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $19,037 $30,000 Not Implemented