IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0281 # 08 Y:2022 08 2022 INSULATE BARE EQUIPMENT $1,876 $2,748 Not Implemented
TT0281 # 09 Y:2022 09 2022 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,000 $25 Not Implemented
TT0281 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $63 Not Implemented
DL0212 # 01 Y:2022 01 2022 REPAIR FAULTY LOUVERS AND DAMPERS $20,616 $975 Not Implemented
DL0212 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,912 $5,000 Not Implemented
DL0212 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $634 $495 Not Implemented
DL0212 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,199 $6,100 Not Implemented
DL0212 # 05 Y:2022 05 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,655 $5,200 Not Implemented
DL0212 # 06 Y:2022 06 2022 USE OPTIMUM THICKNESS INSULATION $692 $2,233 Not Implemented
DL0212 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,396 $21,500 Not Implemented
DL0212 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,587 $13,450 Not Implemented
DL0212 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $210 Not Implemented
DL0212 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,304 $22,424 Not Implemented
CO0745 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $1,180 $0 n/a
CO0745 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,752 $0 n/a
CO0745 # 03 Y:2022 03 2022 USE OPTIMUM TEMPERATURE $10,067 $0 n/a
CO0745 # 04 Y:2022 04 2022 USE SOLAR HEAT FOR HEAT $75,255 $445,900 n/a
SU0522 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $1,603 $0 Not Implemented
SU0522 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $986 $0 Not Implemented
SU0522 # 03 Y:2022 03 2022 PAY BILLS ON TIME TO AVOID LATE FEES $163 $0 Not Implemented
SU0522 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $370 $0 Not Implemented
SU0522 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,106 $0 Not Implemented
SU0522 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $642 $923 Not Implemented
SU0522 # 07 Y:2022 07 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $168 $362 Not Implemented
WV0633 # 01 Y:2022 01 2022 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $14,598 $23,000 Not Implemented