IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,350

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0249 # 03 Y:2000 03 2000 AUTOMATE FINISHING PROCESS $62,250 $100,000 Not Implemented
SD0249 # 04 Y:2000 04 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $25,500 $23,000 Not Implemented
NV0152 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $6,243 $5,535 Not Implemented
NV0152 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $642 $450 Not Implemented
NV0152 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $532 $500 Not Implemented
NV0152 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $898 $303 Implemented
NV0152 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,244 $0 Implemented
NV0152 # 06 Y:2000 06 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,178 $3,500 Implemented
SD0248 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,001 $40,000 Not Implemented
SD0248 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,837 $14,800 Implemented
SD0248 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,532 $7,536 Implemented
SD0248 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,585 $0 Implemented
SD0248 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,887 $4,950 Implemented
SD0248 # 06 Y:2000 06 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $5,300 $12,500 Not Implemented
SD0248 # 07 Y:2000 07 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $11,600 $1,000 Implemented
SD0248 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $743 $800 Not Implemented
SD0248 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,397 $8,500 Implemented
SD0248 # 10 Y:2000 10 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $70,500 $120,000 Not Implemented
SD0248 # 11 Y:2000 11 2000 INSTALL SYSTEM TO COLLECT SCRAP $13,426 $11,836 Implemented
SF0191 # 01 Y:2000 01 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $6,345 $4,320 Not Implemented
SF0191 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $833 $1,707 Not Implemented
SF0191 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,529 $32,232 Not Implemented
SD0247 # 01 Y:2000 01 2000 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,396 $8,250 Not Implemented
SD0247 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,905 $3,000 Not Implemented
SD0247 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,007 $0 Not Implemented