IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0170 # 07 Y:1993 07 1993 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,360 $0 Implemented
AM0170 # 08 Y:1993 08 1993 USE PHOTOCELL CONTROLS $1,155 $570 Implemented
AM0170 # 09 Y:1993 09 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,300 $700 Not Implemented
AM0170 # 10 Y:1993 10 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $410 $400 Not Implemented
AM0171 # 01 Y:1993 01 1993 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $11,850 $820 Implemented
AM0171 # 02 Y:1993 02 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,780 $10,160 Not Implemented
AM0171 # 03 Y:1993 03 1993 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $22,300 $54,800 Implemented
AM0171 # 04 Y:1993 04 1993 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $18,500 $72,675 Not Implemented
AM0171 # 05 Y:1993 05 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,710 $10,160 Not Implemented
AM0171 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $0 Implemented
AM0171 # 07 Y:1993 07 1993 REDESIGN PROCESS $830 $712 Not Implemented
AM0171 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $4,630 Implemented
AM0171 # 09 Y:1993 09 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $520 $0 Implemented
AM0168 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $6,380 $20,925 Not Implemented
AM0168 # 02 Y:1993 02 1993 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $7,055 $1,160 Not Implemented
AM0168 # 03 Y:1993 03 1993 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,568 $3,090 Not Implemented
AM0168 # 04 Y:1993 04 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,650 $7,350 Not Implemented
AM0168 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $420 Implemented
AM0168 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $990 $2,140 Implemented
AM0168 # 07 Y:1993 07 1993 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,000 Not Implemented
AM0168 # 08 Y:1993 08 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $530 $153 Implemented
AM0168 # 09 Y:1993 09 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $299 $0 Not Implemented
AM0169 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $3,000 $14,000 Not Implemented
AM0169 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $319 $0 Implemented
AM0169 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $810 $2,000 Implemented