IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0450 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,023 $1,625 Not Implemented
LE0450 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,186 $2,470 Not Implemented
LE0450 # 06 Y:2018 06 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,038 $8,000 Not Implemented
LE0450 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,643 $36,750 Not Implemented
LE0450 # 08 Y:2018 08 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,463 $22,000 Not Implemented
SD0561 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,515 $1,500 Implemented
SD0561 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,493 $3,414 Not Implemented
SD0561 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $1,167 $2,318 Not Implemented
SD0561 # 04 Y:2018 04 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $670 $683 Implemented
SD0561 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $615 $1,015 Implemented
NC0609 # 01 Y:2018 01 2018 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $9,405 $0 Not Implemented
NC0609 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,593 $8,972 Implemented
NC0609 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $173 $350 Not Implemented
NC0609 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $200 Implemented
NC0609 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $2,500 Implemented
NC0609 # 06 Y:2018 06 2018 DEVELOP A REPAIR/REPLACE POLICY $1,705 $5,685 Implemented
UU0129 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,622 $0 Implemented
UU0129 # 02 Y:2018 02 2018 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $9,283 $120 Implemented
UU0129 # 03 Y:2018 03 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,783 $500 Implemented
UU0129 # 04 Y:2018 04 2018 SELL USED PLATES TO AN ALUMINUM RECYCLER $5,775 $0 Implemented
UU0129 # 05 Y:2018 05 2018 KEEP EQUIPMENT CLEAN $942 $80 Implemented
UD0983 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $390 $50 Not Implemented
UD0983 # 02 Y:2018 02 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $13,719 $2,500 Not Implemented
UD0983 # 03 Y:2018 03 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,019 $4,500 Not Implemented
UD0983 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,393 $6,000 Not Implemented