IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0251 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $19,891 $2,392 Implemented
LL0251 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $4,548 $450 Not Implemented
LL0251 # 05 Y:2006 05 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,060 $3,280 Not Implemented
LL0251 # 06 Y:2006 06 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,767 $3,600 Not Implemented
LL0251 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $6,369 $9,300 Implemented
LL0251 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $634 $787 Implemented
LL0251 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $508 $960 Not Implemented
LL0251 # 10 Y:2006 10 2006 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $302 $930 Not Implemented
LL0251 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $245 Not Implemented
OK0726 # 01 Y:2006 01 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,838 $2,305 Not Implemented
OK0726 # 02 Y:2006 02 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,412 $13,554 Not Implemented
OK0726 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,127 $339 Not Implemented
OK0726 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,283 $32,000 Not Implemented
OK0726 # 05 Y:2006 05 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $18,769 $16,500 Not Implemented
OK0726 # 06 Y:2006 06 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $31,992 $32,500 Not Implemented
OK0726 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $55,348 $35,269 Not Implemented
OK0726 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,168 $8,723 Not Implemented
OK0726 # 09 Y:2006 09 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $579 $2,006 Not Implemented
OK0726 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $1,213 $331 Not Implemented
OK0726 # 11 Y:2006 11 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,188 $5,750 Not Implemented
OK0725 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $36,035 $14,223 Not Implemented
OK0725 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $1,143 $339 Not Implemented
OK0725 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $365 $437 Not Implemented
OK0725 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $29,580 $24,609 Not Implemented
OK0725 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,367 $27,265 Not Implemented