IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0815 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,876 $3,096 Not Implemented
OK0815 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,335 $20,544 Not Implemented
OK0815 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $3,531 $633 Implemented
OK0799 # 01 Y:2010 01 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $58,238 $1,003 Not Implemented
OK0799 # 02 Y:2010 02 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,629 $21,300 Not Implemented
OK0799 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,065 $9,879 Not Implemented
OK0799 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,109 $19,184 Not Implemented
OK0799 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,663 $226,451 Not Implemented
OK0799 # 06 Y:2010 06 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $31,971 $54,000 Not Implemented
OK0799 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,972 $29,894 Not Implemented
OK0799 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,490 $8,730 Not Implemented
OK0799 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,489 $24,789 Not Implemented
OK0799 # 10 Y:2010 10 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $22,062 $351,000 Not Implemented
OK0799 # 11 Y:2010 11 2010 INSULATE BARE EQUIPMENT $1,902 $1,801 Not Implemented
OK0799 # 12 Y:2010 12 2010 INSULATE BARE EQUIPMENT $623 $1,230 Not Implemented
OK0799 # 13 Y:2010 13 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,897 $435 Not Implemented
MZ0052 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,921 $1,160 Not Implemented
MZ0052 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,855 $16,700 Implemented
MZ0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,361 $18,360 Implemented
MZ0052 # 04 Y:2010 04 2010 OPTIMIZE PLANT POWER FACTOR $9,103 $8,984 Implemented
MZ0052 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,546 $1,000 Not Implemented
OK0794 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,132 $75,405 Implemented
OK0794 # 02 Y:2010 02 2010 INSTALL SET-BACK TIMERS $2,786 $3,239 Not Implemented
OK0794 # 03 Y:2010 03 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $10,317 $159,840 Not Implemented
OK0794 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,034 $12,733 Not Implemented