Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0523 # 01 Y:2002 | 01 | 2002 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,262 | $23,900 | Not Implemented |
MA0523 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $6,907 | $11,770 | Implemented |
MA0523 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,108 | $0 | Implemented |
MA0523 # 04 Y:2002 | 04 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,510 | $0 | Implemented |
MA0523 # 05 Y:2002 | 05 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,423 | $2,200 | Not Implemented |
MA0523 # 06 Y:2002 | 06 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $467 | $250 | Implemented |
MA0523 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $359 | $230 | Implemented |
MA0523 # 08 Y:2002 | 08 | 2002 | USE SYNTHETIC LUBRICANT | $308 | $0 | Not Implemented |
UF0311 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,935 | $119,640 | Not Implemented |
UF0311 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $20,300 | $1,640 | Implemented |
UF0311 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,246 | $0 | Not Implemented |
UF0311 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,812 | $20,000 | Implemented |
UF0311 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $31,940 | $189,000 | Not Implemented |
UF0311 # 06 Y:2002 | 06 | 2002 | RECYCLE FLUORESCENT LAMPS | $10,412 | $1,895 | Not Implemented |
SD0306 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,205 | $23,000 | Not Implemented |
SD0306 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,006 | $240 | Not Implemented |
SD0306 # 03 Y:2002 | 03 | 2002 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $3,708 | $1,000 | Not Implemented |
SD0306 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,521 | $6,822 | Not Implemented |
SD0306 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,468 | $0 | Implemented |
SD0306 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,478 | $5,000 | Not Implemented |
UU0028 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $986 | $0 | Implemented |
UU0028 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $5,590 | $9,800 | Implemented |
UU0028 # 03 Y:2002 | 03 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,500 | $7,600 | Implemented |
UU0028 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,450 | $700 | Implemented |
UU0028 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $844 | $406 | Implemented |