IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,990

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0207 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,800 $6,208 Implemented
DL0207 # 11 Y:2022 11 2022 INSULATE BARE EQUIPMENT $797 $2,124 Not Implemented
DL0207 # 12 Y:2022 12 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $298 $1,434 Not Implemented
DL0207 # 13 Y:2022 13 2022 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $1,993 $2,500 Implemented
UA0259 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,827 $1,000 Implemented
UA0259 # 02 Y:2022 02 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,057 $2,063 Not Implemented
UA0259 # 03 Y:2022 03 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $100,047 $47,295 Not Implemented
UA0259 # 04 Y:2022 04 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $225,594 $969,631 Not Implemented
UA0259 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $50,082 $26,090 Implemented
LE0529 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $727 $0 Not Implemented
LE0529 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,841 $6,763 Implemented
LE0529 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,316 $89,649 Implemented
LE0529 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $118,441 $791,800 Implemented
IC0262 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,327 $4,150 Not Implemented
IC0262 # 02 Y:2022 02 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $356 $5,338 Not Implemented
IC0262 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,351 $33,110 Not Implemented
MI0407 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $7,899 Implemented
MI0407 # 02 Y:2022 02 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,700 $3,310 Not Implemented
MI0407 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,509 $850 Not Implemented
MI0407 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,291 $580 Implemented
MI0407 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,645 $520 Not Implemented
MI0407 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $2,200 Not Implemented
AS0522 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,984 $54,180 Implemented
AS0522 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $21,588 $279,240 Implemented
AS0522 # 03 Y:2022 03 2022 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,084 $17,430 Implemented