IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0314 # 08 Y:1990 08 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $83,411 $150,000 Implemented
UD0314 # 09 Y:1990 09 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,980 $0 Not Implemented
UD0315 # 01 Y:1990 01 1990 INSTALL STORM WINDOWS AND DOORS $12,565 $12,000 Implemented
UD0315 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $50,970 $40,000 Implemented
UD0315 # 03 Y:1990 03 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,180 $70,000 Implemented
UD0315 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,852 $2,800 Implemented
UD0315 # 05 Y:1990 05 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,503 $0 Not Implemented
UD0311 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,733 $2,400 Implemented
UD0311 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $678 $250 Not Implemented
UD0311 # 03 Y:1990 03 1990 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $549 $0 Implemented
UD0311 # 04 Y:1990 04 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,107 $6,000 Not Implemented
UD0312 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $2,400 Implemented
UD0312 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,262 $7,825 Implemented
UD0312 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,422 $2,000 Implemented
UD0312 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $157,000 $220,000 Not Implemented
UD0312 # 05 Y:1990 05 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,569 $0 Not Implemented
UD0312 # 06 Y:1990 06 1990 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,884 $0 Implemented
UD0312 # 07 Y:1990 07 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,775 $5,000 Not Implemented
UD0312 # 08 Y:1990 08 1990 INSTALL TIMERS AND/OR THERMOSTATS $21,868 $12,000 Not Implemented
UD0312 # 09 Y:1990 09 1990 REPAIR AND ELIMINATE STEAM LEAKS $24,995 $0 Implemented
UD0312 # 10 Y:1990 10 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,168 $100,000 Not Implemented
UD0309 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,076 $18,000 Not Implemented
UD0309 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $3,951 $700 Implemented
UD0309 # 03 Y:1990 03 1990 AIR CONDITION ONLY SPACE NECESSARY $1,295 $200 Implemented
UD0309 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $3,374 $8,000 Not Implemented