Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0113 # 02 Y:1991 | 02 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $34,390 | $88,900 | Implemented |
AM0113 # 03 Y:1991 | 03 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,300 | $280 | Implemented |
AM0113 # 04 Y:1991 | 04 | 1991 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $2,815 | $400 | Implemented |
AM0113 # 05 Y:1991 | 05 | 1991 | INSULATE BARE EQUIPMENT | $340 | $290 | Implemented |
AM0106 # 01 Y:1991 | 01 | 1991 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $6,600 | $24,750 | Not Implemented |
AM0106 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $221 | $144 | Not Implemented |
AM0106 # 03 Y:1991 | 03 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $375 | $500 | Not Implemented |
AM0106 # 04 Y:1991 | 04 | 1991 | INSTALL SET-BACK TIMERS | $198 | $260 | Not Implemented |
AM0106 # 05 Y:1991 | 05 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $127 | $260 | Not Implemented |
AM0106 # 06 Y:1991 | 06 | 1991 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $80 | $0 | Not Implemented |
AM0107 # 01 Y:1991 | 01 | 1991 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $12,100 | $0 | Implemented |
AM0107 # 02 Y:1991 | 02 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,000 | $400 | Implemented |
AM0107 # 03 Y:1991 | 03 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $438 | $2,272 | Implemented |
AM0107 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,730 | $2,400 | Implemented |
AM0107 # 05 Y:1991 | 05 | 1991 | INSTALL SET-BACK TIMERS | $750 | $260 | Implemented |
AM0107 # 06 Y:1991 | 06 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $650 | $0 | Implemented |
AM0107 # 07 Y:1991 | 07 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $405 | $130 | Implemented |
AM0108 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,366 | $0 | Implemented |
AM0108 # 02 Y:1991 | 02 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,700 | $12,000 | Implemented |
AM0108 # 03 Y:1991 | 03 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,750 | $0 | Implemented |
AM0108 # 04 Y:1991 | 04 | 1991 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,400 | $103 | Implemented |
AM0108 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $80 | $60 | Implemented |
AM0108 # 06 Y:1991 | 06 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $235 | $181 | Implemented |
AM0108 # 07 Y:1991 | 07 | 1991 | INSULATE BARE EQUIPMENT | $96 | $426 | Implemented |
AM0109 # 01 Y:1991 | 01 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,730 | $400 | Implemented |