IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,489

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0885 # 05 Y:2011 05 2011 USE SYNTHETIC LUBRICANT $55,071 $0 Not Implemented
GT0885 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,318 $8,163 Not Implemented
GT0885 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,257 $12,880 Implemented
GT0885 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,494 $14,600 Implemented
GT0884 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,890 $44,900 Implemented
GT0884 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $4,290 $210 Implemented
GT0884 # 03 Y:2011 03 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $57,100 $361,600 Not Implemented
GT0884 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,400 $600 Implemented
GT0884 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,610 $14,000 Not Implemented
GT0884 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,894 $43,550 Not Implemented
GT0884 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $29,550 $2,000 Implemented
GT0884 # 08 Y:2011 08 2011 UPGRADE CONTROLS ON COMPRESSORS $31,010 $160,650 Not Implemented
GT0884 # 09 Y:2011 09 2011 OPTIMIZE PLANT POWER FACTOR $6,584 $37,790 Not Implemented
GT0883 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $1,910 $242 n/a
GT0883 # 02 Y:2011 02 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,435 $800 n/a
GT0883 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,504 $36,650 n/a
GT0883 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,385 $107,085 n/a
GT0883 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,404 $46,133 n/a
GT0883 # 06 Y:2011 06 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $42,689 $368,265 n/a
GT0883 # 07 Y:2011 07 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,194 $7,000 n/a
GT0882 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,634 $0 Implemented
GT0882 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,201 $0 Not Implemented
GT0882 # 03 Y:2011 03 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,143 $70,000 Not Implemented
GT0882 # 04 Y:2011 04 2011 METER WASTE WATER $3,614 $6,000 Not Implemented
GT0882 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $16,076 $55,000 Implemented