IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0071 # 04 Y:1986 04 1986 REPAIR AND ELIMINATE STEAM LEAKS $5,948 $500 Implemented
ST0071 # 05 Y:1986 05 1986 RECOVER MECHANICAL ENERGY $91,733 $135,000 Not Implemented
TN0282 # 01 Y:1986 01 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,871 $4,270 Implemented
TN0282 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $556 $0 Implemented
TN0282 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,088 $165 Implemented
TN0282 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $889 $0 Implemented
TN0282 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $822 $540 Not Implemented
TN0282 # 06 Y:1986 06 1986 USE COMPRESSOR AIR FILTERS $285 $0 Implemented
TN0282 # 07 Y:1986 07 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $311 $0 Implemented
TN0284 # 01 Y:1986 01 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $8,573 $1,383 Implemented
TN0284 # 02 Y:1986 02 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $8,026 $14,300 Implemented
TN0284 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,112 $195 Implemented
TN0284 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $707 $104 Implemented
TN0284 # 05 Y:1986 05 1986 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $422 $800 Implemented
TN0284 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $80 $300 Implemented
TN0285 # 01 Y:1986 01 1986 REPAIR AND ELIMINATE STEAM LEAKS $26,651 $490 Implemented
TN0285 # 02 Y:1986 02 1986 REPAIR AND ELIMINATE STEAM LEAKS $20,398 $1,400 Implemented
TN0285 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $9,667 $1,955 Implemented
TN0285 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,628 $0 Implemented
TN0285 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $4,585 $1,288 Not Implemented
TN0285 # 06 Y:1986 06 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,677 $6,720 Implemented
TN0285 # 07 Y:1986 07 1986 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,825 $1,480 Implemented
TN0285 # 08 Y:1986 08 1986 INSULATE BARE EQUIPMENT $3,692 $1,739 Not Implemented
TN0285 # 09 Y:1986 09 1986 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,479 $1,240 Not Implemented
TN0285 # 10 Y:1986 10 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,515 $0 Implemented